NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/7DCAS/Protective Wall Type A & B®Section & Elevation®Floor Plan
Document / 4 pages

Section and elevation drawings, Barclay Street site

Machine-extracted title · confidence 90%

Architectural section and elevation drawings for a building located on Barclay Street.

NYC-WTC_000166799–000166802

Folder label: “Protective Wall Type A & B®Section & Elevation®Floor Plan”

Page image
Scanned page image, NYC-WTC_000166800
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

i SWAHEHAYBEI CflIIELLARCHITECTS ,----------- PROVIDE CAULKING ' ’ --------------- 1---------- PROVIDE CAULKING / @ TOP OF WALL /WT. ®

BOTTOM OF EXISTNIG 5” DRY DECK BOTTOM OF EXISTNIG WALL DECK SCREW EXPANSION BOLTS-/ 1/2” DIA. HILTI OR EQ. 1/2” THICK Pb^TE 4”x4”x1/2” SCREW BOLTS CONTIN. STL. ANGLE 4”x4”xl/2” 1” DIA. CONTIN. STL. ANGLE STC WASHER 6" WIDE METAL BRACING 6" WIDE METAL BRACING 3'-0” O.C. MAX. 5’-0” O.C. MAX.

5/4” THICK DENS SHIELD 5/4” THICK- DENS SHIELD STAGGERED STAGGERED TYVEK HOUSEWRAP TYVEK HOUSEWRAP

8 SJW14 8 SJW14 12” O.C. 12” O.C.

7/16" FIBER GU\S: 7/16" FIBER GLAS: 10 1/2' 5/8” GYPSUM WALL 5/8’'"GYPSUM WALL BOARD BOARD

SECTION DETAIL FIBER BAH INSULATION

6” WIDE METAL BRACING 5'-0” O.C. MAX.

6”X6” X 18 GA. BENT METAL

12 GA. CONTIN. METAL RUNNER 1'-0"

TOP OF EXISTNIG SU\B SECTION DETAIL ANCHOR RUNNER TO SU\B PART. ELEVATION V/ FASTENING ARRANGEMENT SCALE:1 l/2"=l’-0" SCALE:1/4”=1'-O” TYPICAL

SWANKE HAYDEN CONNELL ARCHITECTS MAYOR’S OFFICE OF EMERGENCY MANAGEMENT 7 WORLD TRADE CENTER, NEW YORK CITY, NY. PROTECTIVE WALL TYPE ” MAY 13, 98

NYC-WTC_000166800

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166800Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order #044R for fuel oil line work, 7 WTC, · Box 7DCAS

NYC-WTC_000168439

Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.902

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168702 · Box 7DCAS

Ambassador Construction submits Change Order #001 for sheetrock wall offset work at 7 World Trade Center.

Similar indexed content

Compare copies and versions →