NYC 9/11 Public Portal Document
Tom Sarakasetrin, PE Senior Electrical Engineer
TKLP
Education Master of Science, Electrical Engineering, Lamar University, Beaumont, Texas, 1978
Bachelor of Science, Electrical Engineering, Chulalongkorn University, Bangkok,
Thailand. 1974
Protective Relay Coordination and Power System Applications Seminar,
General Electric Co., 1981
Registration 1985, Professional Engineer: Pennsylvania
Years Experience With TKLP: 8 With Other Firms: 10
Responsibilities Mr. Sarakasetrin is responsible for the engineering and design of electrical power and light
ing distribution systems for various commercial buildings, computer centers, and industrial
facilities. This includes designing of emergency power systems, UPS/battery systems and a
data cabling system. He is also responsible for the development of material specifications
and preparation of engineering calculations, and construction phase services.
Relevant Prior to joining The Kling-Lindquist Partnership, Inc., Mr. Sarakasetrin was a senior engi
Experience/ neer for Bechtel Power Corp., B^htel Petroleum, Inc., Fluor Engineers and Constructors,
Qualifications Inc., and Levingston Shipbuilding Co., during which time he was responsible for engineer
ing, design, and construction of electrical power and lighting distribution, instrumentation,
and control systems for refinery and chemical plants, pipeline pump stations, marine facili
ties, and nuclear power plants. The following lists representative projects on which he has
worked:
Merrill Lynch Teleport Data Center, Staten Island, NY
This 200,000 SF facility is Merill Lynch's largest and most sophisticated data center. It's
ultimately 12 MVA network substation supports the computer processing and world-wide
telecommunication. UPS systems and emergency generator plant are provided to assure a
24-hour uninterrupted operation.
United Airlines/Apollo Center, Denver, CO
Involved in field testing and operation manual write-up on the generator paralleling
switchgears, the main switchboards and the UPS systems of the 150,000 SF new MIS com
puter center.
Morgan Stanley - Pierrepont Building, Brooklyn, NY
Involved in field testing on the major electrical equipment and the system reliability study
for the 120,000 SF data processing facility.
The Bank of New York, Newark, DE
This office complex contains 125,000 SF which includes administrative, office area, cafeteria,
computer facility, and a communications center.
Southwestern States Bankcard Association, Newark, DE
This office building contains 60,000 SF which includes administrative, office area, produc
tion facility, and a computer center.
General Electric Co., Pittsfield, MA
This executive office building contains 20,000 SF which includes administrative, executive
office, board room, and AV equipment.
Forest City Tech Place Associates for Full Engineering Services 05/06/92 [P2371 B-19
NYC-WTC_000166691
OCR can misread numbers and units. Confirm readings against the page image before using them.