NYC-WTC_000166488–000166533Folder label: “NYC DOB WTC Building Code Task Force Findings and Recomendations - Feb. 2003”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
5.3 Draft Retroactive Sprinkler Requirements All high-rise commercial buildings 100 feet or more in height, that are without automatic sprinkler protection on the effective date of the local law shall be required to install such a sprinkler system providing complete coverage throughout the building. t
The Building shall be completely protected within fifteen years of the effective date of the local. law. The sprinkler system shall be installed throughout the building as leases of individual tenants expire and the space is renovated for new tenants. The owners of buildings that are already fully sprinklered shall file an affidavit attesting to fact that the building is already in compliance with this local law. Said affidavit shall be filed with the NYC Department of Buildings within one year of the adoption of this law. Within 3 years of the adoption of this local law, owners of those buildings that have at least 15% of the building'covered by sprinklers shall file an affidavit with the NYC Department of Buildings documenting those areas of the building that are already sprinklered. The owners shall also submit, at the same time, an implementation plan detailing when and how the remaining portions of the building will come into compliance with the requirements of this law. Implementation of the plan will be monitored annually by the Fire Department of New York's High Rise Inspection Unit. Within 5 years of the adoption of this local law, owners of those buildings with less than 50% of the building covered by sprinklers shall file an affidavit with the NYC Department of Buildings . documenting those areas of the building that are already sprinklered. The owners shall submit, at ( the same time, an implementation plan detailing how when and how the remaining portions shall come into compliance. Implementation of the plan will be monitored annually by the Fire Department of New York’s High Rise Inspection Unit.
A committee, composed of representatives of the Commissioners of the Department of Buildings and FDNY and a representative of the Real Estate Board of New York, would review requests for 1 time extensions based upon extreme hardship.
5.4 Draft Proposal - Controlled Inspection of Fireproofing on Structural Building Members In all buildings classifed in Section 27-253 of the Building Code as occupancy group E, as spaces in buildings are being renovated, a controlled inspection shall be required to ensure that all fireproofing is fully intact on all structural building members exposed by the renovation. The controlled inspection shall be signed and sealed by either a licensed architect of engineer and shall be filed with the NYC Department of Buildings prior to the issuance of a Building Permit. This new legislation can be adapted into the present Section 16-01 of the Building Code. Implementation timetable would commence three (3) months after the adoption of this law.
i
Page 40 WTC Building Code Task Force February 2003 Findings and Recommendations
NYC-WTC_000166526
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141695
Section of an environmental assessment describing existing physical conditions and construction impacts at the World Trade Center site.
4 shared non-person entities · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
2 shared non-person entities · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141585
Map showing the condition of buildings at the World Trade Center site as of September 21, 2001.
9 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
4 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168718
Document outlining fire evacuation procedures and objectives for 7 World Trade Center.
3 shared non-person entities · 1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173475
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
6 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
7 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0139.
Cited alongside this record in an Ask answer