NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
NYC-WTC_000166488–000166533Folder label: “NYC DOB WTC Building Code Task Force Findings and Recomendations - Feb. 2003”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
3 Sources of Information
3.1 FEMA Building Performance Study Report The Building Performance Study (BPS) Report, written by the Building Performance Assessment Team (BPAT), made a number of preliminary conclusions regarding the events of September 11th. Significantly, the steel framing system, egress stairways and their marking, and evacuation I training were all cited as contributing to the successful evacuation of most building occupants. Several design features, however, were identified as needing more detailed evaluation in order to understand their contribution to the performance of the WTC buildings and how they may perform in other buildings. These included: r I 1 • the overall strength of the floor truss system; • the susceptibility of fire proofing to blasts and impacts; • the inability of stairway enclosures to resist impacts; • and the concentration of emergency stairways in the central building core. Several other issues were found to be critical to building performance in one or more of the WTC buildings and the surrounding structures: • The redundancy and/or robustness of structural framing systems. • Adherence of fireproofing under impact and fire conditions. • Performance of structural connections under impact and fire loads. • The reliability of water supply to sprinklers. • Capacity and robustness of egress systems when building damage occurs. • Robustness of structural transfer systems during fires. The BPAT concluded that these features should be evaluated in detail to determihe how they affect the performance of the World Trade Center buildings and how they might perform in other buildings and situations. In addition to detailed technical analysis, the study team felt that extensive technical, policy, and economic examination of these concepts should be conducted prior to making specific building code revisions.
In the absence of sufficient data to determine the likelihood of any particular threat, the study team also recommended that individual building owners consider their own level of risk and investigate possible ways to enhance the redundancy and robustness of their structures. Indeed, the marketplace has already recognized this need and begun to voluntarily take additional precautions in instances of high. risk. I
I (
(!
Page 16 WTC Building Code Task Force February 2003 Findings and Recommendations I
NYC-WTC_000166502
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141695
Section of an environmental assessment describing existing physical conditions and construction impacts at the World Trade Center site.
4 shared non-person entities · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
2 shared non-person entities · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141585
Map showing the condition of buildings at the World Trade Center site as of September 21, 2001.
9 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
4 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168718
Document outlining fire evacuation procedures and objectives for 7 World Trade Center.
3 shared non-person entities · 1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173475
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
6 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
7 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0139.
Cited alongside this record in an Ask answer