NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 33/56 NASSAU STREET BIN: 1001109 33 Maiden Lane, 29-39 Maiden Lane/32-40 John St/ 1 Federal Reserve Plaza
Document / 9 pages

Asbestos air quality letter, 33 Maiden Lane, Feb 2002

Machine-extracted title · confidence 95%

Letter from building engineer confirming ongoing cleaning and testing for asbestos at 33 Maiden Lane since September 11, 2001.

NYC-WTC_000097954–000097962

Folder label: “56 NASSAU STREET BIN: 1001109 33 Maiden Lane, 29-39 Maiden Lane/32-40 John St/ 1 Federal Reserve Plaza

Page image
Scanned page image, NYC-WTC_000097957
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SEP-15-2001 1731 GILSANZ MURRAY STEFICK 212 47? 5975 P.05/0?

examined at the upper • One of two egress stairs serving the entire building was displacement) portion of the building (for signs of unusual

Exposed foundation walls in the cellar level of the building the status of In addition to our "walk-through," we interviewed Mr. Sherin to ascertain structural drawings (Weiskoff & various critical mechanical systems. Original building the existing structural Pickworth, circa 1986) were provided for our use to confirm system: a steeI framed structure (lateral system consisting of a moment resisting frame) supported on a pile foundation.

FIndinsi

We observed no signs of structural distress in the building to suggest any deleterious effect from the collapse of the World Trade Center Towers. We observed no cracking in the masonry facade in the vicinity of the lateral framing system or in the foundation walls.

We observed no damage in the facades of the building that could be attributed to the World Trade Center collapse.

The roof of the building appears to be free of debris and impact damage.

We wore advised by the Mr. Sherin that, throughout the crisis, normal Con Ed power has been uninterrupted and that normal City water service has continued. Telephone Service to the building has, however, been interrupted and was ~till lacking at the time of our visit.

Mr. Sherin indicated that all building life safety systems were completely operational, however, the lack of normal telephone service deprived die Fire Command Center of the ability to automatically phone-in alarm signals to the monitoring central station.

M ar

We believe the building to be structurally sound and safe for occupancy. Critical life safety systems appear to be functional as are basic HVAC, electric, and plumbing services. The only component apparently lacking for complete operation of the building is normal telephone service.

Sincerely, Gllsanz Murray Stefieek, LLF

oseph BlBlanch 1el

£9Z-d 800/t00d 8V9-I HZle Eee Z1Z d11089 dimim 3HI-mold sa10:l0 ZOOZ-ZI-8O

NYC-WTC 000097957

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000097957Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000097971 · Box DEP Box 33

Letter from Federal Reserve Bank of New York providing results of hazardous component testing at their facilities following the September 11 attacks.

Filed in the same folder

Compare copies and versions →