NYC 9/11 Public Portal Document
DI•LU I HUUI
KERUKI-IRAISPUKIAIIUN FIKE, NUNDIKULIUKAL FIKE UM EIVICMUENUY.
INCIDENT
DATE AND TIME
INCIDENT
LOCATION
ALARM RECEIVED
DURATION
ADMIN.
COMPANY
BLOCK
NUMBER
MONTH
B0X
LOCATION
ЕPOPT
REPORT
4
010
0026
04-04-87
HOUR
1316
18
HOURS
MINUTES
ной
01:30
26
12
AIDED AND CASUALTIES
CIVILIANS
COnF
IGNITION
BOy
NUMBER
0084 0054
34
30
SPECIAL
USE
PHING
GADSE
38
113/011
43
45
EVACUATED
FIRST AID
INJURED
KILLED
UNIFORMED
INJURED
EXTINGUISH.
TYPE INCIDENT
EQUIP. INVOLVED
HEAT FORM
MATERIAL TYPE
MATERIAL FORM
FACTOR
SMOKE DETECTORS
NAME OF OCCUPANT (Driver)
1
2
3
COS.
RESP.
08
ROOM. APT. NO
Set.
Smolen P.A, Police
IEFT IN CHARGE
46
54
59
64
70
cUTI0OD
NUMBER
IINCL. HYPHEN)
STREET NAME
7
WIC
84
77
Equipment Involved in Ignition
YR
MAKE
TO7
POWER
112 MODEL
SERIAL NO
ITEM
YR.
If Mobile Propeny
113
MAKE
115
130
MODEL
SERIAL NO
145
LICENSE STATE
ITEM
167
5 007 02 7 010 02
228 UNIT
PTS. 234
184
199
221
240
246
252
258
264
270
275
OPERATIONS
Units responded to 7 WIC foI a scaffold located on the outside of the 24th
Iloor which had to be secured to the building, companies operated as follow;
I10 responded to 24th floor and broke window out to secured scaffold.
En7 responded to Vessey and West St. to prevent pedestrians and vehicles
from entering area while window was being broken, scaffold secured both
companies took up leaving F.A. Police in charge.
-Lellen-
John J. Spillane
TYPE FULL NAME
NYC-WTC_000165954
D.C.
4318
TIME OF ARRIVAL
TYPE FULL NAME
ADMINISTRATIVE COMPANY
DIV.
TIME OF ARRIVAL
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000165954Source: NYC Law Department, mirrored locally
Department of Design and Construction correspondence regarding the review of an environmental health and safety plan for soil boring work at 7 World Trade Center.
Department of Design and Construction correspondence regarding the review of an environmental health and safety plan for soil boring work at 7 World Trade Center.
Department of Design and Construction correspondence regarding the review of an environmental health and safety plan for soil boring work at 7 World Trade Center.
Department of Design and Construction correspondence regarding the review of an environmental health and safety plan for soil boring work at 7 World Trade Center.