NYC 9/11 Public Portal Document
8F-24 (12/86)
31530-8028-N
REPORT - STRUCTURAL FIRE
TYPE REPORT
INCIDENT
LOCATION
COMMUNITY
BOARD
ADMIN.
COMPANY
MONTH
DATE AND TIME
INCIDENT
BOX
ALARM RECEIVED
DURATION
MINUTE
HOURS
MINUTES
HOW REPORTED
INITIAL ALARM
ALARM
LOCATION
HIGHEST
BOROUGH
вох
NUMBER
ENG
MARINE
CLASS
AMOUNT
1
REVISEO REPORT
101 5 010/05 20 88
0038
01:30/32/1 21 0084
0256
0008 01 025 13 11 08
50
55
62
AIDED AND CASUALTIES
EXTIN.
IGNITION
STRUCTURE
FIRE ORIGIN
FFIRE EXTENSION
DAMAGE
DETECTORS
GUISHMENT
CIVILIANS
EVACUATED
FIRST AID
INJURED
KILLED
UNIFORMED
INJURED
CODE
SPK
STP
COND
HEAT FORM
MATERIAL TYPE
MATERIAL FORM
FACTOR
JUVENILE
CONSTRUCT
STATUS
TOMMPLEX
FLODA CODE
•OECUPANCY
IN BLDG
AREA
jU MANNER
EPANCIES
, DAMAGEO
FLAME
SMOKE
WATER
PRESENT
TYРE
POWER
PERFORMANCE
FOR INVESTIGATION
1
00
83
00
15
113
98. 97 97 97 21 0 11
591.159..03.50
39
100
9901x66/112111
BF-24
73
76
88
101
NUMBER
(INCL HYPHEN)/
SUFFIX
PREFH
DIRECTION
STREET NAME
SUFEY
DIREC
STORIES
DEFECTIVE DETECTOR
AREA
VIC
DZ-Or
WIDTH/LENGTH
BRAND
SERIAL NO.
48
0400 0400
115
126
146
152
161
177
192
NAME OF OCCUPANT
ROOMIAPT..
211
EQUIPMENT INVOLVED IN IGNITION
ITEM
YA.
MAKE
162
LEFT IN CHARGE
Sec. Ufficer Marrero
MODEL
SERIAL NUMBER
191
POWER
BADGE NO
220
244
264
007
010 20
15 004 15 5
006 12
15 003 05
OPERATIONS
Upon arrival at box 84 found fire in construction shanties on the 3Id flvor. Iraasmitted 10:76 and
10:41-1.Units oporated VIZ:
EnO-Stretched line Irom standpipe and extinguished fire,
Ilo-lound sprinklers erd in operation Shut down sprinklers and made necessary search, ventilation
aud overhaulad as requirad.
I7-assisted E10.
EA Stretched line to * 4th 11ocx.Stood fast•
Eb-assisted it.
B.C.
btetone
Bn-1
D.C.
Rudolph & Quatrone
0043
TYPE FULL NAME
TIME OF ARRIVAL
DIV.
TIME OF ARRIVAL
WHITE-FIRE RECORD
YELLOW-BATTALION
TYPE FULL NAME
PINK-REFERRAL
GOLD—ADMINISTRATIVE COMPANY
PAGE
OF:
2
NYC-WTC_000165961
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000165961Source: NYC Law Department, mirrored locally
Department of Design and Construction correspondence regarding the review of an environmental health and safety plan for soil boring work at 7 World Trade Center.