NYSDEC letter re: Con-Edison release report at 7 WTC substation,

Machine-extracted title · confidence 95%

State agency review of Con-Edison's plan detailing the release of transformer oil and cable dielectric fluid at the World Trade Center site.

NYC-WTC_000165927–000165937
Page image
Scanned page image, NYC-WTC_000165936
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Public Safety - Critical Infrastructure

NYC-WTC_000165936

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165936Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000142085 · Box DEP Box 06

Official notice instructing building engineers on procedures to arrange gas service reconnection at World Trade Center sites.

Cited alongside this record in an Ask answer

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Cited alongside this record in an Ask answer

Compare copies and versions →