a. All costs associated with the maintenance.
repair, replacement or reconstruction of the Sewer, or
installation of new equipment, shall be the sole responsibility
of DEP, except as otherwise specifically set forth below.
b. In the event that Amtrak provides flagging or
track monitoring in connection with any maintenance or repair of
the Sewer, Amtrak shall bear the cost of such flagging or track
monitoring. If the work being performed on the Sewer extends
beyond maintenance or repair, such as replacement,
reconstruction, or the installation of new equipment, DEP shall
reimburse Amtrak for the cost of any flagging or track
monitoring provided by Amtrak.
c. At least twenty (20) days in advance of
performing any non-emergency work in, on, or around the Sewer,
DEP shall submit its plans for review and written approval to
Amtrak's Assistant Chief Engineer-Design and Construction, 2000
Market Street, Philadelphia, Pennsylvania 19103, or to such
other representative as may be designated by Amtrak in writing.
No such non-emergency work shall be performed by or on behalf of
DEP without such prior written approval of Amtrak, which
approval shall not be unreasonably withheld or delayed. DEP
acknowledges that because of train schedules on the Line, it may
be necessary to schedule non-emergency work at times that are
set by Amtrak in order to minimize or eliminate interference
with train operations.
d. In the event that DEP performs emergency work
in, on, or around the Sewer it shall, as soon as possible, give
3