1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗North Access Tunnel W. 33rd St. To w. 38TH ST
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000165386–000165387
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
3 AMTRAK DESIGN REVIEW COMMENTS JOB JMIll SHEET OF SOBHin AL ! PROJECT HUASEF^- D5R> pitciniwE» REVIEVED By< PATE ‘ A - BILL COMPLT' B “ OESICBER TO ETALUATE. 0 * DELETE CDHRENT
HEM DV&. CAI- COHHEIIT5 REr. FIIAl HO. 5F£t. 51. CORF. PHP.
NYC-WTC_000165387
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000165384
Internal memorandum acknowledging receipt of 90% submission drawings for the Westside Connection Project and referencing hydraulic computations.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165405
Inter-office memorandum requesting review of hydraulic computations for the siphon and gravity sewer routing in the 60% submission.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165399
Internal memorandum inquiring whether the Bureau accepts the proposed siphon concept shown in the 60% submission drawings for the Westside Connection Project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165401
Inter-office memorandum inquiring if the proposed siphon concept in the 60% submission drawings is acceptable to the Bureau of Sewers.
1 shared topics · Same agency, volume and box · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165301
DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165403
Inter-office memorandum requesting hydraulic review of the proposed siphon in the Westside Connection Project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165684
Follow-up memo requesting resubmission of missing design calculations for project manholes.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.927
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165698
Engineering firm responds to Department of Environmental Protection comments regarding manhole maintenance jurisdiction and drop pipe design.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165365
DEP Bureau of Sewers clarifies hydraulic review procedures and provides technical comments on proposed siphon design in tunnel.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.923
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000165670
Department of Environmental Protection responds to engineering firm regarding revised grading and connection drawings for the project.
Similarity score 0.923 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.922 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112249
Invoice for roof cleanup services involving asphalt and gravel removal totaling over $24,000 at 26 Wall Street.
Similarity score 0.921 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119304
Fax transmission log page from January 3, 2001 related to World Trade Center environmental records.
Similarity score 0.920 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000103467
Chain of custody documentation for OSHA-compliant air sampling and abatement verification at the hotel located at 55 Church Street.
Similarity score 0.920 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141776
Fragmented text from an EEDAU personnel shift log at the information center.
Similarity score 0.919 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000165289
Environmental Protection Department record related to tunnel project between W. 33rd and W. 38th Street.
Filed in the same folder
NYC-WTC_000165290
Letter enclosing a signed agreement between DEP and a contractor regarding sewer work in the vicinity of 11th Avenue.
Filed in the same folder
NYC-WTC_000165299
DEP legal correspondence regarding tunnel construction and sewer work in vicinity of 11th Avenue and W. 33rd Street.
Filed in the same folder
NYC-WTC_000165301
DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
Filed in the same folder
Filed in the same folder