NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165204
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery Park City Commercial Center Bldg. ’B' WTC River Water Intake System Relocations

B. Subcontractor shall note that the "Port Authority of New York and New Jersey" (P-ANYNJ) must review and ap- prove the preposed construction operations within sixty (60) feet of their facilities before work is started. No equipment or materials shall be set, placed, stored, erected, or crossed on or over the facilities of the "Port Authority of New York and New Jersey" without ’written authorization from the Con­ tractor. The “Port Authority of New York and New Jersey" facilities are defined as all areas within the easements provided to "PANYNJ" for the "PATH-Tubes", river water intake lines, river water pump room, and river water outfall lines. 1.05 SUBCONTRACTOR’S RESPONSIBILITY FOR EVALUATION A. The Contractor, Developer and Engineer make no repre­ sentations, regarding the character or extent of the subsoils, water levels, existing structural, mechani- cal and electrical installations, above or below ground or other subsurface conditions which may be encountered during the Vlork. The Subcontractor must make his own evaluation of existing conditions which may affect methods or cost of performing the Work, based on his own examination of the facility or other information. Failure to examine the drawings or other information shall not relieve the Subcontractor of his responsibility for satisfactory accomplishment of the Work. 1.06 SHUT-DO^T^S A. Shut-Down of Existing Facilities 1. Subcontractor shall include in his progress schedule dates for shut-down of existing systems and con.nection to existing systems. 2. All shut-downs shall be arranged by the Subcon­ tractor through the Contractor under the super­ vision of the "PANYMJ", All related costs shall be the responsibility of the Subcontrcictor - 3. The Sub-contractor shall advise the Contractor a minimum of fourteen (14) days in advance of the dates the Subcontractor will be prepared to tie into or work on the existing lines.

Electrical qppr ini CnnHi finny; NYC-WTC_000165204

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165204Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →