NYC 9/11 Public Portal Document
BATTERY PARK CITY
COMMERCIAL CENTER
CUL-DE-SAC
SECTION 03315
FOUNDATION CONCRETE
I. GENERAL
A. DESCRIPTION
1. The work covered by this division of the Specifications
includes the construction described in this Paragraph A,
including all labor necessary to perform and complete such
construction, materials and equipment incorporated or to be
incorporated in such construction and all services,
facilities, tools and equipment necessary or used to perform
and complete such construction.
2. Place concrete in accordance with items II and III below.
3. RELATED WORK NOT INCLUDED IN THIS SECTION
BUT SPECIFIED ELSEWHERE
1. The following related items are specified in other sections
of the Specifications:
a. Alteration - Section Q2110.
b. Earthwork. - Section 02200
c. Steel Piling - Section 02310
C. SUBMITTALS
1. Submit shop and placing drawings of reinforcing steel.
2. Submit design mix for 4,000 psi concrete structural
elements.
II. PRODUCTS
A. CONCRETE
1. Concrete for structural elements shall have a minimum
28 day strength of 4,000 psi and a maximum 4.'' slump.
BPC-COMMERCIAL CENTER 03315-1
FOUNDATION CONCRETE
NYC-WTC_000165153
OCR can misread numbers and units. Confirm readings against the page image before using them.