NYC 9/11 Public Portal Document
BATTERY PARK CITY
COMMERCIAL CENTER
CUL-DE-SAC
STEEL PILING
SECTION 02310
I. GENERAL
A. DESCRIPTION
The Work covered by this division of the Specifications includes
the construction described in this Paragraph A, including all
labor necessary to perform and complete such construction, all
materials and equipment incorporated or to be incorporated in
such construction and all services, facilities, tools and
equipment necessary or used to perform and complete such
construction.
1. Furnish, install as required 100 ton design
capacity HP 10 x 57 steel piles for support of concrete
deck relieving platform south of the WTC utility lines in
tlie vicinity of the cul-de-sac.
2. Furnish all surveys, layouts, inspection and record keeping
incident to pile driving and as specified in the Contract
Documents.
E. RELATED WORK NOT INCLUDED IN THIS SECTION
BUT SPECIFIED “ELSEWHERE
1. The following related items are specified in other Sections
of the Specifications.
a. Alteration Section 02110
b. Earthwork Section 02200
c. Foundation Concrete - Section 03315
REFEI^NCES
1» Perform all Work in accordance with the latest editions
and revisions of applicable standards and/or specifications
of:
a. American Institute of Steel Construction (AISC)
b. American Society for Testing & Materials (ASTM)
EPC-COyJlERCIAL CENTER STEEL PILING