← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165114
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

BATTERY PARK CITY COMMERCIAL CENTER

WORLD TRADE CENTER RIVER WATER INTAKE SYSTEM RELOCATIONS SECTION 02110 DEMOLITION

I. GENERAL

A. DESCRIPTION 1. The Work covered in this division of the Specifications includes the construction described in this Paragraph A, including all labor necessary to perform and complete such construction, all materials and equipment incorporated or to be incorporated in such construction and all'services, facilities, tools and equipment necessary or used to perform and complete such construction. 2, Demolish existing 1941 Bulkhead wall as shown. 3. RELATED WOR^NOT INCLUDED IN THIS SECTION BUT SPECIFIED ELSEIVHERE 1. The following related items are specified ,in other Sections of the Specifications: a, Earthwork Section 02200 b. Concrete Filled Steel Pipe Piles Section 02363 c. Foundation Concrete Section 03315

C. GENERAL REQUIREMENTS 1. All utility lines and existing structures shown or not shown on the Drawings, shall be protected from damage during construction/ demolition.. The Subcontractor shall be solely responsible for conducting his operations without causing injury, damage or interrup- tien of utility services. Any damage caused by the. Subcontractor's operations shall be repaired by the Subcontractor at his expense.

2. The Subcontractor shall carry out his operations - •in a manner that will protect and cause a minimum of inter­ ference to adjoining occupants and vehicular parking facilities and to pedestrian and vehicular traffic in ad­ jacent areas. The Subcontractor shall provide and maintain

BPC-COMMERCIAL CENTER 02110-1 WORID TRADE CENTER-RELOCATIOSI

NYC-WTC_000165114

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165114Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →