BATTERY PARK CITY
COMMERCIAL CENTER
WORLD TRADE CENTER RIVER WATER INTAKE SYSTEM
RELOCATIONS
SECTION 02110
DEMOLITION
I. GENERAL
A. DESCRIPTION
1. The Work covered in this division of the Specifications
includes the construction described in this Paragraph A, including
all labor necessary to perform and complete such construction,
all materials and equipment incorporated or to be incorporated
in such construction and all'services, facilities, tools and
equipment necessary or used to perform and complete such
construction.
2, Demolish existing 1941 Bulkhead wall as shown.
3. RELATED WOR^NOT INCLUDED IN THIS SECTION
BUT SPECIFIED ELSEIVHERE
1. The following related items are specified ,in other
Sections of the Specifications:
a, Earthwork Section 02200
b. Concrete Filled Steel
Pipe Piles Section 02363
c. Foundation Concrete Section 03315
C. GENERAL REQUIREMENTS
1. All utility lines and existing structures shown or not shown
on the Drawings, shall be protected from damage during construction/
demolition.. The Subcontractor shall be solely responsible for
conducting his operations without causing injury, damage or interrup-
tien of utility services. Any damage caused by the. Subcontractor's
operations shall be repaired by the Subcontractor at his expense.
2. The Subcontractor shall carry out his operations -
•in a manner that will protect and cause a minimum of inter
ference to adjoining occupants and vehicular parking
facilities and to pedestrian and vehicular traffic in ad
jacent areas. The Subcontractor shall provide and maintain
BPC-COMMERCIAL CENTER 02110-1
WORID TRADE CENTER-RELOCATIOSI