Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165125
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

F. OBSTRUCTIONS 1. When a pile meets an obstruction which will damage the pile tip or cause the pile.to drift off location, the ob­ struction shall be removed by spudding, augering, drilling or other approved methods, and the pile redriven. 2. If in the opinion of . the Contractor a pile has been damaged by obstructions during driving, or otherwise does not meet specification requirements, it will be abandoned and a replacement pile or piles shall be driven at no addi­ tional cost to the Contractor. .G. TOLERANCE 1. Piles shall be accurately located and their locations at cut-off elevation shall not vary more than 3 inches from the plan locations shown on the Contract Drawings. 2. No pile required to be driven plumb shall be out of plumb more than 2 percent.

H. CUT OFF 1. The tops of all piles shall be cut off at elevations indicated o.n the Drawings or as specified by the Foundation Engineers. The cut shall be clean and to a true plane. ■ I. ABANDONED PILES 1. Abandoned piles shall be pulled or shall be cut off two feet below specified elevation. J. ANALYSES AND CORRECTIVE MEASURES 1. The analysis and redesign work called for herein shall be performed for the Contractor by tlie Foundation Engineer. Cost for this Work shaj.l be at the Subcontractor's expense. 2. The Foundation Engineer shall analyse the piles, as driven, to determine whether corrective measures are required. If corrective measures are not required, approval will be given to. prex-eed with the concrete work and there will be no cost for corrective work to the Subcontractor.

. BPC-C0MI4ERCTAL CENTER STEEL PILING 02310-5 WELD T^DE CENTER -RELOCATIONS

NYC-WTC_000165125

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165125Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →