NYC 9/11 Public Portal Document
Battery Park City
Commercial Center Bldg. ’B'
.WTC River Water Intake
System Relocations
SECTION 16030
CONCRETE FOR ELECTRICAL WORK
PART I - GENERAL
A. DESCRIPTION
1. The work covered by this section of the specifi
cations includes the construction described in
cluding all labor necessary to perform and com
plete such construction, c)ll materials and equip-
ment incorporated or to be incorporated in such
construction <and all services, facilities, tools •
and equipment necessary or used to perform and
complete such construction.
2. Work included; The work of this section shall in
clude, but is not limited to, the following:
a. Reinforced concrete for electrical systems.
B. SUBMITTALS
1. Shop drawings; Submit shop and placement drawings
of: Reinforcing steel, manhole details.
2. Submit design mixc
PART II - PRODUCTS
A. CONCRETE
1. Concrete shall have a minimum 28-day strength of
3000 pounds per square inch,-.
B. Concrete Aggregates
1. Fine aggregate shall, be clean, natural siliceous
sand consisting of hard,, strong, durable, uncoated
particles, and shall be free from injurious
amounts of soft cr .flaky particles, shale, loam,
alkali, organic matter, or other deleterious sub
stances. It uhall contain not more than three per
cent (3%) by weight of silt or other particles ca
pable of passing through a No. 200 sieve. Th.e
percentage of material finer than No. 200 sieve
shall be determined in accordance wit?£ the Stan
dard Method of Test for Amount of Material Finer
Concrete For
Electrical Work
1
NYC-WTC_000165237