Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165229
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery Park Ci^ Commercial Center Bldq. "B" WTC River Water Intake System Relocations

Grounding Assembly for Electrical Manhole 1. The electrical materials for the grounding assem- bly for electrical manholes shall be in accor- dance with Port Authority Standard Drawing 430.240. The materials shall be similar to the following items of the Burndy Engineering Co., Inc., except as otherwise noted. Equivalent con­ nections as manufactured by O.Z. Electrical Manu­ facturing Co. or Thomas & Betts will be accept­ able. 2. Equipment shall be as follows: a. Cable Clamp - Type GB except with hex head silicon bronze bolt and approved brass in­ sert in concrete wall. b. Ground connector - Type GC c. Ground rod connector - Type GP d. Cable connector - Type NT e. Ground rod - copperweld rods as manufactured by the Copperweld Steel Co. or equivalent as manufactured by Anaconda Wire and Cable or Hubbard & Co. G. Arcproofijiq 1. If the arcproofing on a cable has been disturbed for any reason it shall be reinstalled as soon as possible after the disturbance. 2. Arcproofing is not required on secondary and con­ trol cables. 3. All new cable and all existing cables in electric manholes (power) which are to be spliced or re­ connected shall be arcproofed with two wrappings of • arcproofing tape over the entire exposed length of cable, including splices. The first. wrap shall be wound half-lapped, the second butt­ lapped. Cables shall be grouped by circuits and

Electrical Work 16020-15

NYC-WTC_000165229

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165229Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →