← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165227
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery Park City Commercial Center Bldg. "B" WTC River Water Intake System Relocations

12. Those splices and terminations which are not shown on the Contract Drawings and are not speci­ fied herein, shall be made' in accordance with the cable manufacturers* printed recommendations pro­ vided such recommendations are approved by the Port Authority Engineer. 13. Materials specified herein or called for on the Contract Drawings shall be as follows: a. Friction tape shall conform to the "Tenta­ tive Specifications for Friction Tape for General Use for Electrical Purposes" (Desig­ nation: D69) of the American Society for Testing and Materials. b. Plastic tape shall be similar and equal to "Scotch. Electrical Tape No. 33" of the Min­ nesota Mining and Manufacturing Company. Equal tapes of the Bishop Manufacturing Cor­ poration or the Permacel Tape Corp, will be acceptable. c. Tapes and other splicing materials shall be used only during the period recommended by the manufacturer and only if their condition is such as to meet the manufacturer’s stan­ dards. 14. The Sub-Contractor shall fasten a cable tag to each end of each cable, wire or group of wires comprising a circuit or feeder and to each of the foregoing in the manholes through which such wires run or at which they terminate. Each tag shall bear the respective circuit feeder or cable designation and shall be fastened to conductors at both ends of the tag with a 1/16 inch diameter monel metal wire. The ends of the tag shall be . rolled around the wire in a manner approved by the Port Authority Engineer. The circuit and feeder designations for tags shall be as directed by the Port Authority Engineer. Tags shall be placed on wires so that they will be readily visible and where a circuit or feeder contains two or more conductors, the tie wires for the tag

Electrical Work 16020-17

NYC-WTC_000165227

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165227Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →