← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165213
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery Park City Commercial Center Bldg. "B" WTC River Water Intake System Relocations shall be installed that only one end is free to move with respect to the conduit. 5. The setting of flexible fittings installed in asbestos cement conduit runs shall be as directed by the Port Authority Engineer. 6. Changes of direction in asbestos cement conduits shall be made by the use of wide bends, sweeps and offsets and not by the use of elbows. 7. Asbestos cement conduits which terminate in the concrete walls of manholes, handholes or other- concrete structures shall be provided with manu­ factured end bells or with end bells formed in the concrete by means of properly shaped wooden plugs. 8. Asbestos cement conduit duct bank arrangements shall be in accordance with Port Authority Stan­ dard Drawing 405.012 and as shown on Drawings. B. Cleaning and Testing Conduit 1. After conduits and accessories have bee’i instal­ led and all concreting operations completed. all conduit runs shall be satisfactorily cleared of all obstructions and foreign matter. Any defects which might damage cable upon installation shall be corrected. 2. Empty conduits installed under this contract shall be tested in the presence of the Port Authority Engineer by pulling through each con- duit a flexible cylindrical mandrel, having an outside diameter one-quarter inch less than the inside diameter of the conduit. 3. The use of rope to pull a brush or a mandrel will not Ibe permitted. Only steel cable shall be used. Any defects or stoppages occurring in por~ • tions of the conduit runs installed by the Sub­ contractor shall be corrected at the Subcontrac­ tor’s own expense.

Electrical Work 16020-3

NYC-WTC_000165213

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165213Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →