Sent out 207 letters,(less than 255 because some information was already returned for buildings in that area). 70
responses to those letters. Extension granted for another 10 respondents. Some letters received for unoccupied
premises. Letter needs to be sent to those to require written notice to us that they are unoccupied and to notify the owner
of facade and roof responsibilities is clean up is needed.
This information will be collated so that it can be posted on our website and will include: address, owner?, certified
contractor?, whether report has been submitted by certified contractor, whether remediation was conducted or not,
whether owner has filed a letter attesting that clean up was not required by conditions. Number of sampling results
submitted (total) for all buildings to date. If no legal barrier, sampling information will be provided on request at cost to
inquiries on individual premises. Calls from individual residents about more specific results in their building will be handled
by our people to summarize sampling data unless volume is unmanageable.
2
NYC-WTC_000164488
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000164488Source: NYC Law Department, mirrored locally
Memo detailing complaints received, inspection phases of buildings in Lower Manhattan, and status of facade and exterior structure inspections near World Trade Center.
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
Memo detailing complaints received, inspection phases of buildings in Lower Manhattan, and status of facade and exterior structure inspections near World Trade Center.
Memo detailing complaints received, inspection phases of buildings in Lower Manhattan, and status of facade and exterior structure inspections near World Trade Center.