NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 43/E-mails 2002 M. Gilsenan
Document / 11 pages

WTC contractor health and safety meeting handouts, January 2002

Machine-extracted title · confidence 80%

Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.

NYC-WTC_000164098–000164108

Folder label: “E-mails 2002 M. Gilsenan

Page image
Scanned page image, NYC-WTC_000164105
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

City of New YorkDepartment of Design and Construction

WTC EMERGENCY PROJECT Environmental Health and Safety Bulletin

HAUL ROAD SAFETY Snowstorm and icy conditions, which commonly occur during this time of the year, can adversely impact haul road conditions and safety at Ground Zero. Poor road conditions can make it difficult to operate equipment safely and can lead to loss of control of the vehicles, collisions with other vehicles, runaway vehicles, and vehicles going off the roadway and overturning. The Prime Contractors/Subcontractors and vehicle operators must be prepared for these conditions and take precautions. Prior to a potential snow/ice storm, lay a sufficient amount of salt and/or milling on all traffic roadways at Ground Zero. The Department of Sanitation (DOS) will handle roadways to Piers 6 and 25 outside of the inner zone; however, contractor supervisors should travel the route periodically to assess conditions. Supervisors should contact DOS for additional salting as needed. Furthermore, roadways should be inspected and maintained regularly. Special checks should be made after changes in weather conditions. The Prime Contractors/Subcontractors and vehicle operators should be alert to, and anticipate, changes in road conditions, especially with changes in the weather. The Prime Contractors/Subcontractors and vehicle operators should also inform Incident Command (DDC/FDNY) of any unusual or potentially dangerous road conditions such as:

• Ice and snow drifts (including “black ice” that is not easily detected on roadways); Poor drainage areas; Cracks or unstable slopes above or below the roadways; ♦ Washed out areas, ruts and gullies; or • Debris on roadways. For further information on this subject contact your employer and refer to the WTC EMERGENCY PROJECT ENVIRONMENTAL. SAFETY. AND HEALTH PLAN

NYC-WTC_000164105

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000164105Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →