In your meeting with EPA this morning a map with quadrant boundaries
developed by DEP was discussed. The report I received was that the
quandrant boundaries were developed based on the number of buildings in
each quadrant in an attempt to equalize the load on each contractor. We
also have a quadrant map however it was developed based upon the number
of apartments (based on information from HPD) and attempted to equalize
the load by equalizing the number of apartments in each quadrant. As I
look at the proposed map and the calls we have received already it looks
like about half the calls (and cleanups) would be in one quadrant (the
sw one). I would like to understand more fully the system you are
proposing. Please give me a call at 212 637 3559. I will be in all day
tomorrow as will Ray.