provided by tenants. A copy of the contractor requirements is attached. For additional and specific tasks, refer
to this attachment.
The project monitor shall provide daily monitoring of all work activities to insure compliance with the scope-of-
work, the applicable rules and regulations, and the contracts. This includes but is not limited to the verification
of worker certification status, the use of proper engineering controls and appropriate work practices.
The project monitor shall direct corrective actions when appropriate and shall be responsible to stop work until
corrections are made. Findings must be reported inamediately to DEP via telephone call. Written notification of
observation and corrective actions must be received by the DEP within 48 hours of the telephone call.
Monitor shall complete a Project Completion Report for each work area and submit it to DEP within 48 hours
of successful clearance results.
Pre-cleaning Sampling Schedule
The Sampling Technicians will collect Pre-Cleanup Samples in Accordance with the following Tables:
Sampling Matrix for Clean up Project
Wipe Sampling Asbestos/ Lead/ Dioxin PAHs Silica/ Total Dust Total#
Locations MMWF Metals Calcite/ of
Gypsum Samples
Ceiling 1 0 0 0 0 0 1
WaUs 1 1 1 1 1 0 5
Bare Floor 1 1 1 1 1 0 5
Counter Tops 1 1 1 1 1 1 6
or Furniture
(table tops)
Total Wipe 4 3 3 3 3 1 17
Samples/
Parameter
Micro-vacuum Asbestos/ Lead/ Dioxin PAHs Silica/ Total Dust Total#
Sampling MMWF Metals Calcite/ of
Locations Gypsum Samples
Carpet or 3 3 0 0 0 0 6
Drapery
Fabric 3 3 0 0 0 0 6
Furniture
(couch or
chair)
Micro-vacuum 6 6 0 0 0 0 12
Samples/
Parameter
3 of 8