NYC 9/11 Public Portal Document
cleaning and before removal from the work area.
4. HEPA air filtration devices (AFDs) will run continuously during all cleaning activities, as
appropriate given site conditions. AFDs shall be installed and operated to provide a
minimum of one air change every 15 minutes. Make up air should be derived from a non
impacted source (i.e. open window or common spaces previously cleaned).
5. A minimum of one asbestos supervisor shall be present in each building during work.
6. A Cleaning Checklist (to be developed by EPA) will be completed by the cleaning
contractor as tasks are completed to document the progress of the cleaning.
7. The cleaning contractor shall notify tihe monitoring contractor immediately upon
completion of the cleaning. The Monitoring Contractor will conduct a thorough visual
inspection to verify the absence of visible dust accumulations. If dust is observed the
cleaning contractor will reclean as necessary at no additional cost.
8. Air sampling shall be performed by the Monitoring Contractor after the area is free of dust
accumulations as determined by tihe Monitoring Contractor. The residence will be
recleaned and retested if the clean-up criteria of 0.'5529 fibers/cc (PCME measured by
TEM) is not achieved or if determined necessary by EPA. This clean-up criterion may be
reevaluated and revised, if determined necessary based on field conditions and analytical
limitations.
9. Any damage or loss that occurs during cleaning is the responsibility of the cleaning
contractor. The cleaning contractor is not responsible for damage or loss caused by the acts
of third parties not involved in the cleaning activities.
10. Owner/residents may identify and tag certain furnishings (e.g. carpets and fabric covered
furniture) for disposal rather than cleaning. Disposal of residents’ personal property shall
not occur without prior written authorization by the owner.
11. Disposal of all wastes generated during the cleaning shall be the responsibility of the
contractor. All waste generated shall be treated as asbestos-containing material (ACM).
Transportation and disposal of generated waste shall be in compliance with all applicable
rules and regulations.
12. If mold or peeling, flaking or chalking paint is observed in the work area, the cleaning
contractor shall immediately contact the Monitoring Contractor.
13. If in-place materials suspected to contain asbestos are observed the Cleaning Contractor
shall immediately notify the Monitoring Contractor. The Monitoring Contractor will
evaluate the condition of the material to identify damaged, deterioration, delamination, etc.
The Cleaning Contractor shall wrap suspect ACM that is in good or excellent condition
with 6-mil polyethylene sheeting and seal airtight with duct tape or equivalent method prior
to cleaning or air monitoring.
6
NYC-WTC_000163348
OCR can misread numbers and units. Confirm readings against the page image before using them.