to expose heat elements. Fins are to be brushed and vacuumed to remove dust.
All cleaning equipment will be vacuumed and/or washed for use on the residence.
3. HEPA air filtration devices (AFDs) will run continuously during all cleaning activities. A
minimum of one air change every 30-minutes shall be provided.
4. At least one asbestos supervisor shall be present at each work place (work place is defined
in Title 14, Chapter 1 RCNY as the work area and the decontamination enclosure system).
5. A cleaning checklist (to be developed) will be completed by the supervisor at the completion
of the cleaning.
6. A thorough visual inspection will be conducted by the Project Monitor to verify the absence
of visible dust accumulations. Additional clean-up procedures shall be performed where
visible dust is observed.
7. Air sampling shall be performed by the Monitoring Contractor after the area is free of dust
accumulations as determined by the Project Monitor. If the apartment does not meet the
cleanup criteria of 0.0009 fibers/cc(TEM), the apartment will be recleaned at no additional
cost and retested. [ needs additional analytical language]
8. Any damage or loss to that occurs during cleaning is the responsibility of the cleaning
contractor. The cleaning contractor is not responsible for damage or loss caused by the acts
of parties not involved in the cleanup.
9. All waste generated shall be treated as asbestos containing material and shall be transported
and disposed of in compliance with Title 15, Chapter 1 of the Rules of the City of New York
and New York Industrial Code Rule 56. Transportation and disposal ofgenerated waste shall
be in compliance with all applicable rules and regulations.