NYC 9/11 Public Portal Document
Gilsenan, Michael
From: Theodorellys, Penny
Sent: Thursday, March 06, 2003 11:39 AM
To: [email protected]; [email protected]; [email protected];
PH i; [email protected]: [email protected] ;
[email protected] ; [email protected]; [email protected];
[email protected]; [email protected] ;
danielk@bum bleandbum ble.com < PH
[email protected]: [email protected]; [email protected] ; Fernandez
Cc: [email protected] ; [email protected]; Gilsenan, Michael; Radhakrishnan,
Krish
Subject: 114 Liberty Street
Good Morning.
The “walk-throughs” with residents have been completed. The cleaning contractor, ETS, has
started to mobilize equipment to the building. He has started a pre-cleaning on the ground floor to
allow for the construction of the equipment and worker decontamination enclosure systems. The
systems should be completed by the end of today’s shifts. Today, he will also be bringing in his
negative pressure ventilation equipment and placing the units on the floors that are ready. The
environmental consultant, JLC, has been sampling for the past two days and representatives will be
present again today. As you are aware, JLC is monitoring the project activities and will have a
project monitor on site during all the cleaning contractor’s activities.
A proposed schedule of the work has been supplied to building representatives and is available at
your lobby. However, once the project begins access to the building will be restricted. Entry must be
through the worker decontamination enclosure system and a sign-in log must be maintained (the
sign-in log is mandated by the rules and will be applicable until satisfactory clearance results are
received). Only certified individuals and authorized visitors with proper equipment will be permitted to
enter the building including the lobby. The contractor will allow immediate access to representatives
of regulatory agencies on official business and verify whether anyone else is authorized to enter by
reaching out to DEP. According to the current project design, the entrance on Liberty Street will be
closed and sealed. Entry will be via the loading dock and building representatives will be present at
the ground floor in the areas outside the decontamination enclosure systems.
As most of you are aware a number of issues and “items to be addressed” resulted from the “walk
throughs”. I also received a number of e-mails and wanted everyone to have the opportunity to
receive the responses.
1. In accordance with the scope of work for this project (Item 18), residents must identify items for
disposal with clearly legible tags and provide a listing of the items. Residents have the final
decision on cleaning or disposal of items. Item 18 also states that kitchen stoves shall be wet-
wiped and HEPA-vacuumed and all other appliances shall be removed and disposed.
Some residents have opted to keep some appliances rather than discard them. As referenced
above, residents have the final decision on this matter. However, since the scope of work
specifically states the items shall be disposed, the Department will need a listing of these items
“to be saved”. Included on this list should be microwaves, mixers, television sets, stereo
components, speakers, dishwashers, washing machines, etc. This is to make sure that we don’t
have any misunderstandings about what items stay and which are discarded.
Appliances that remain will be cleaned on the exterior surfaces and on surfaces that can be
1
NYC-WTC_000163021