NYC-WTC_000163021–000163023Folder label: “E-mails 2003 M. Gilsenan”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
readily reached by opening a door (i.e. the interior of a freezer or microwave will be wet wiped). Appliances will not be opened or dismantled for the cleaning. Since most appliances have vents, it is possible that dust is present within the item and will not be removed as part of this cleaning.
In some cases, a “save” list or a statement “to discard all items except...” was an easier item to prepare for the resident and was/is acceptable.
2. Residents are responsible for the removal of any valuables. If such removal is not feasible, the resident must provide notification as specified in Item 25. As in the above, these items should be provided on a “save” list to ensure the items receive the special handling necessary.
3. Item 17 states that items identified by residents for cleaning that cannot be cleaned shall be brought to the attention of DEP and that DEP will make a determination. This item also indicates that the Department will not make the determination to dispose any item without resident authorization. Items will be cleaned as specified in item 17. Typically, upholstered furniture, drapes, bedding, clothing, wicker items, items with deep intricate crevices and mesh, are difficult to clean. Items that were difficult to clean were identified and addressed on site during the walk through. Clothing will not be handled. If the items that were addressed remain in the unit for the cleaning, the items will be cleaned “as best as possible”, and then will be wrapped or placed in plastic bags.
4. In accordance with the scope of work for this project (Item 18), the contractor is not responsible for removing or disassembling built-in items. For the most part, built-in items were disassembled and the components were in a central location. The south kitchen walls were marked in the plans as one of the walls to be removed. These walls have attached cabinetry and various “back splashes” depending on the apartment. The sheet rock will be removed down to the “back splash” and the area behind the wall will be cleaned with extensions on HEPA-vacuums. There is some concern about whether the back-splashes will remain undamaged during this procedure. The contractor will take care to prevent damage, but is not responsible for removing the item.
5. The dropped ceilings are to be removed (Item 13). Since dropped ceilings are to be removed, any lighting, chandeliers, fixtures, attached to the ceilings must be removed if the resident wants to keep them. This is also true of lighting attached to walls that are slated for removal. If these items are not marked and listed for disposal and they remain attached to the surface, the ceiling/wall or portion thereof will not be removed.
6. We have received verbal communication of a couple of errors in the plans submitted to the Department. We will need written confirmation of all these changes in the marked plans. For example, all the walls in the lobby are marked for removal. We received information that only the west wall was to be removed and then we received information that all the walls were remaining. We will need the final decision today and written confirmation if the final decision is not the removal of all the walls. This decision is important in that it affects the way the project is currently designed.
Just one more item, we still need the original request forms for condominium unit 4 and the commercial spaces. Further we need the lists of disposal items (save acceptable as described above) and the “valuables”. We have only received the information from three units.
This concludes the update and response to your questions. If you have any other questions or need 2
NYC-WTC_000163022
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000155227
Memo confirming walk-through completion and start of equipment mobilization at 114 Liberty.
3 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗3 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102668
Project update on resident notifications and contractor equipment mobilization for decontamination systems.
3 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163024
Request to tenants to provide lists of valuable items for removal before contractor mobilization.
3 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155223
Notice requiring 114 Liberty residents to submit preservation lists before cleanup mobilization.
3 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000097165
Memo documenting an inspection of specific apartments at 125 Cedar Street to tag items for cleaning or disposal.
2 shared non-person entities · 1 shared topics · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107407
Permit application detailing background debris conditions and requirements for licensed contractors to clean interior surfaces.
2 shared non-person entities · 1 shared topics · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107169
Letter from DEP responding to an inquiry by enclosing scopes of work for environmental cleanup at 125 Cedar Street.
2 shared non-person entities · 1 shared topics · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100673
Report documenting asbestos inspection and cleanup activities conducted by ETS Construction at 114 Liberty Street.
3 shared non-person entities · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096827
Document identified only by its archive reference number with no visible text content in the excerpt.
1 shared non-person entities · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096696
Memo inviting contractors to bid on a cleaning contract at 125 Liberty Street following the WTC collapse.
2 shared non-person entities · 1 shared topics · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107535
Resident request for DEP to perform cleaning and monitoring work at an apartment in Manhattan.
2 shared non-person entities · 1 shared topics · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000155227
Memo confirming walk-through completion and start of equipment mobilization at 114 Liberty.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163024
Request to tenants to provide lists of valuable items for removal before contractor mobilization.
Similarity score 0.972 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155223
Notice requiring 114 Liberty residents to submit preservation lists before cleanup mobilization.
Similarity score 0.972 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155223
Notice requiring 114 Liberty residents to submit preservation lists before cleanup mobilization.
Similarity score 0.971 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163024
Request to tenants to provide lists of valuable items for removal before contractor mobilization.
Similarity score 0.971 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000162712
Official notice instructing staff to preserve scanned World Trade Center documents as potential evidence in future legal actions.
Filed in the same folder
NYC-WTC_000162713
Official notice instructing staff not to dispose of original World Trade Center documents as they are required for legal proceedings.
Filed in the same folder
NYC-WTC_000162721
Transmission of revised cleaning procedure documents for exhaust and ventilation systems at the World Trade Center site.
Filed in the same folder
NYC-WTC_000162729
DEP submits OSHA compliance justification document for review regarding worker safety in WTC cleanup procedures.
Filed in the same folder
NYC-WTC_000162731
EPA submits detailed technical questions and comments on proposed HVAC cleaning procedures for WTC buildings.
Filed in the same folder