14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Cleaning and monitoring statements of work, June 2002
Machine-extracted title · confidence 85%EPA request for review and feedback on draft scope of work documents for WTC cleaning and air monitoring contractors.
NYC-WTC_000162352–000162365Folder label: “E-mails 2002 M. Gilsenan”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Scope of WorkB
Application: A visual inspection was performed and file presence ofsignificant accumulations ofdust and/or debris from the collapse of the WTC was identified by USEPA or designee. In some unique circumstances, Scope B may be applied on a limited basis within a unit as determined necessary by the Monitoring Contractor in consultation with EPA. Residents may be present depending on these unit specific circumstances. In all other applications ofScope B it is assumed that residents will not be present.
1. A site specific work plan will be prepared for review and approval by U SEPA prior to the start ofwork. This work plan will include detailed procedures for the removal ofdust and debris and the cleaning.
2. An ACP-7 form asbestos project notification form shall be submitted directly to the NYC DEP Asbestos Control Program prior to the start ofwork. NYS DOL notification shall be submitted.
3. At least one asbestos supervisor shall be present at each work place (work place is defined in Title 14, Chapter 1 RCNY as the work area and the decontamination enclosure system).
4. Personal protective equipment including disposable clothing, gloves, and respirators shall be worn during this clean-up activity in accordance with OSHA rules and regulations.
5. Warning signs shall be posted at the approach to the work area.
6. A worker decontamination enclosure system shall be installed at the entrance to the work area. A remote decontamination enclosure system shall be considered when appropriate i.e. inability to comply with the provision due to space limitation or other agency rules, such as for compliance with NYCFD egress requirements.
7. HVAC systems shall be shut down and locked out or isolated locally. The site specific work plan shall provide additional information on the HVAC system and proposed procedures for shutdown or isolation.
8. Isolation barriers shall be installed with two layers of6-mil polyethylene sheeting and sealed with tape.
9. Negative pressure ventilation equipment shall be installed and operated during all clean-up activities. Equipment shall run continuouslyuntil clearance air monitoring. A minimum ofone air change every 30 minutes shall be provided. When ducting to the outside is not possible, a second negative pressure ventilation unit compatible with file primary unit capacity may be coimected in series.
5
NYC-WTC_000162357
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
No available related records indexed in this group.
Filed elsewhere
NYC-WTC_000138659
Circulation of latest draft cleaning and monitoring statement of works for WTC for review and comment.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138743
EPA circulates latest draft scopes of work for WTC indoor dust cleaning program requesting comments.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161167
Forwarded draft Statements of Work for cleaning and monitoring activities requiring review by noon.
13 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138626
Distribution of revised scopes of work documents for WTC indoor cleaning and monitoring contracts.
14 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139232
DEP requests review of attached Scope of Work documents for mold remediation and air monitoring contracts.
10 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138725
EPA transmits revised scopes of work for WTC indoor cleaning and monitoring contracts to DEP.
13 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139209
Administrative notice instructs staff to preserve original World Trade Center documents for potential litigation.
10 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138918
Internal DEP correspondence discussing EPA draft scope of work for WTC program and clarifying agency roles and responsibilities.
10 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161325
Final scope of work documents for indoor dust cleaning and monitoring contractor activities in WTC cleanup program.
12 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000162065
Notice instructing staff to preserve original World Trade Center documents as evidence for potential legal actions against the City.
Filed in the same folder
NYC-WTC_000162066
Daily summary of calls received by the WTC hotline on May 1, 2002, categorized by topic.
Filed in the same folder
NYC-WTC_000162067
Daily summary of calls received by WTC hotline operators on May 1, 2002, categorized by topic.
Filed in the same folder
Filed in the same folder
NYC-WTC_000162073
Daily summary of calls received by the WTC hotline on May 2, 2002, including requests for indoor air testing.
Filed in the same folder