NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 42/E-mails R. Avaltroni 2002
Document / 6 pages

Memo: Insurance requirement update for exterior contracts, May 2002

Machine-extracted title · confidence 95%

Confirmation that no change order is needed to increase insurance requirements for exterior cleanup contracts.

NYC-WTC_000161084–000161089

Folder label: “E-mails R. Avaltroni 2002

Page image
Scanned page image, NYC-WTC_000161088
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

have to rely on the maintaining agency to perform major data cleanup or reformatting

Task Series 3. Application Development The following activities will be required in order to develop and deploy the application interfaces: • Develop Overall Common Application Functions • Revise Asbestos Mapping Application • Develop Each Application Using Iterative Prototyping • Unit Test Each Application • Install and Perform Integration Testing for Each Application • Develop Online Help Manual • Perform System Testing Against Acceptance Criteria • Provide One Year Limited Maintenance Support • Provide User Training • Provide User Support (9-5, M-F) • Provide Administration Support (9-5, M-F)

Tasks Series 4. Systems Architecture Development The following tasks are required to ensure that the software, hardware and networking components of the project are successfully Implemented: • Develop System Configuration Design • Assist in Hardware and Software Procurements • Oversee the System Installation and Configuration • Perform System Acceptance Test • Configure Servers • Provide Oracle DBA Services for GIS DB Server • Provide System Admin Services for GIS System • Perform Stress Testing on the GIS System • Provide System Capacity Requirements

Task Series 5. Project Coordination These tasks are needed to ensure that the project meets scope and budget defined in this document and accurately reflect the needs of the participating agencies and the public. • Attend Weekly LMAQTF Meetings • Attend Weekly Buildings-Parks-Data Committee Meetings • Coordinate with LMAQTF on the Database Issues • Coordinate with LMAQTF on the Presentation Issues • Project Management

Project Costs

Costs By Task The estimated fees for this effort are presented in Table 1 below. Note: The specifics of the work effort described below will vary according to the systems architecture solution chosen.

May 13, 2002 Page 3 of 4 PlanGraphics, Inc.

NYC-WTC_000161088

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000161088Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →