8 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗E-mails R. Avaltroni 2002
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000160896–000160911
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
a
Building Facade Clean-up
Work shall be performed by a NYSDOL licensed asbestos contractor with NYCDEP and NYSDOL asbestos certified workers.
The contractor performing the cleaning should be experienced in cleaning building facades.
The clean up area shall be specified ("specified area") by DEP. The area below the facade cleaning shall be covered with a layer of polyethylene sheeting. All debris must be collected for disposal as ACM directly upon removal from the surface. (i.e. All waste must be double bagged in ACM waste labeled bags.) Running water or water runoff on the building facade is not permitted.
Building occupants shall be notified prior to the facade cleaning. Access to the street below the facade cleaning shall be restricted and marked with caution tape. Cleaning shall not be performed during wind speeds greater than 20 mph.
All HVAC systems and air conditioners shall be turned off. All windows shall be closed during the cleaning of the building. Some air conditioners and windows may require sealing with duct tape to prevent water penetration.
In cases where equipment is rigged from the roof All clean-up activities on the roof must be completed prior to rigging equipment from the roof.
All horizontal surfaces and all windows on the facade shall be cleaned of large bulk material by wetting and hand brushing or scraping with non-metallic bristle brushes or non-metallic scrapers, by wet wiping and/ or by HEPA vacuuming from top to bottom. Only water shall be used for wet wiping and low- pressure washing. Detergents, solvents, additives, and any other chemical cleaning agents are prohibited. The removed material shall be immediately placed into containers (e.g. bags). Windows shall be wet wiped. Free running water shall not be evident during this procedure. Power for HEPA vacuums shall be supplied through ground fault interrupters.
After completion of debris removal, the specified area shall be carefully washed. A low pressure washing technique, moving from top to bottom, shall be employed to minimize water bounce-back. Facades shall be washed with a low-pressure wash not to exceed 250 psi.
At the completion of work, a visual inspection of the abated surfaces and sidewalk shall be performed to verify the absence of visible debris.
Air monitoring shall be performed by an independent NYSDOL licensed third party air monitoring firm with certified workers.
In order to minimize disruption to the public and to the building occupants, it is recommended this work be performed during off-hours.
Page 5 Modified to include Addendum 1 & 2 04/13/02 Prepared by PT
NYC-WTC 000160910
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
Filed elsewhere
NYC-WTC_000108786
A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
10 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141536
Request outlining DEP procurement and EPA supervision of cleaning and sampling contracts for Lower Manhattan residents.
7 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141555
Document requesting FEMA mission assignment for indoor air testing and cleaning programs in Lower Manhattan.
6 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141504
Request detailing residential cleaning, asbestos air testing, and HEPA vacuum distribution programs for Lower Manhattan with cost estimates.
6 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160851
Correspondence regarding suggested changes to exterior cleaning specifications for the WTC site.
5 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗9 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160683
Transmission of WTC-related Q and A document to interagency task force with EPA Regional contact information.
8 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160748
Correspondence discussing the scheduling of meetings with building owners and the need for legal vetting of compliance issues.
7 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160772
Discussion of contractors performing WTC facade cleanup using wet-soaking and power-washing protocols and potential water use restriction exemptions.
7 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160798
Correspondence regarding finalizing release forms and letters required before DEP meetings with building owners to commence exterior work in early April 2002.
7 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160740
Correspondence between EPA and DEP officials discussing scheduling meetings with building owners to address exterior cleanup issues in late March 2002.
8 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000114357
Application outlining compliance requirements and scope for follow-up visual assessments of debris on building exteriors near the World Trade Center.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113500
Legal agreement between NYC DEP and the building owner authorizing city-funded removal of foreign material.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163676
EPA communication to federal and NYC agencies regarding post-9/11 environmental response.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163668
DOH inquiry to DEP about EPA scope of work document and required addendum regarding ACM presumption language.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153614
Draft license agreement between the City and private landowners authorizing DEP to remove foreign material from building facades.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 290 Broadway · 1 pages · confidence 0.15 · verify page 3
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Filed in the same folder
Filed in the same folder
Filed in the same folder
Filed in the same folder
Filed in the same folder