10 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗EPA agency coordination message, April 9, 2002
Machine-extracted title · confidence 50%EPA communication to federal and NYC agencies regarding post-9/11 environmental response.
NYC-WTC_000163676–000163681Folder label: “E-mails 2002 M. Gilsenan”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Building Facade Clean-up
Work shall be performed by a NYSDOL licensed asbestos contractor with NYCDEP and NYSDOL asbestos certified workers.
The contractor performing the cleaning should be experienced in cleaning building facades.
The clean up area shall be specified (“specified area”) by DEP. The area below the facade cleaning shall be covered with a layer of polyethylene sheeting. All debris must be collected for disposal as ACM directly upon removal from the surface, (i.e. All waste must be double bagged in ACM waste labeled bags.) Running water or water runoff on the building facade is not permitted.
Building occupants shall be notified prior to the facade cleaning. Access to the street below the facade cleaning shall be restricted and marked with caution tape. Cleaning shall not be performed during wind speeds greater than 20 mph.
All HVAC systems and air conditioners shall be turned off. All windows shall be closed during the cleaning of the building. Some air conditioners and windows may require sealing with duct tape to prevent water penetration.
In cases where equipment is rigged from the roof: All clean-up activities on the roof must be completed prior to rigging equipment from the roof.
All horizontal surfaces and all windows on the facade shall be cleaned of large bulk material by wetting and hand brushing or scraping with non-metallic bristle brushes or non-metallic scrapers, by wet wiping and/ or by HEPA vacuuming from top to bottom. Only water shall be used for wet wiping and low- pressure washing. Detergents, solvents, additives, and any other chemical cleaning agents are prohibited. The removed material shall be immediately placed into containers (e.g. bags). Windows shall be wet wiped. Free running water shall not be evident during this procedure. Power for HEPA vacuums shall be supplied through ground fault interrupters.
After completion of debris removal, the specified area shall be carefully washed. A low pressure washing technique, moving from top to bottom, shall be employed to minimize water bounce-back. Facades shall be washed with a low-pressure wash not to exceed 250 psi.
At the completion of work, a visual inspection of the abated surfaces and sidewalk shall be performed to verify the absence of visible debris.
Air monitoring shall be performed by an independent NYSDOL licensed third party air monitoring firm with certified workers.
In order to minimize disruption to the public and to the building occupants, it is recommended this work be performed during off-hours.
Page 5 Modified to include Addendum 1 & 2 3/7/2003 Prepared by PT
NYC-WTC_000163681
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000163668
DOH inquiry to DEP about EPA scope of work document and required addendum regarding ACM presumption language.
11 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
11 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164936
Corrected contract addendum addressing errors in prior documentation updates.
10 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143163
Application document outlining scope of work for building exterior cleanup in compliance with federal and state environmental regulations.
10 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164929
Contract document with addendum defining scope of work for environmental assessment or remediation activities.
10 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164949
Contract documentation with addendum defining scope of work for environmental assessment.
10 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118490
Document outlining compliance requirements and scope for debris removal at World Trade Center vicinity buildings.
9 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094321
Notary public document certifying the signature and authority of the DEP Commissioner to execute the preceding legal instrument.
9 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114344
Application outlining compliance requirements and scope for follow-up visual assessments of debris on building exteriors near the World Trade Center.
9 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113448
Letter dated August 8, 2002, submitting signed copies of the debris cleanup license agreement to the Department of Environmental Protection.
9 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119225
Application outlining scope of work for cleaning exterior debris from 17 Battery Place in compliance with federal and state regulations.
9 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 290 Broadway · 1 pages · confidence 0.15 · verify page 1
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000162065
Notice instructing staff to preserve original World Trade Center documents as evidence for potential legal actions against the City.
Filed in the same folder
NYC-WTC_000162066
Daily summary of calls received by the WTC hotline on May 1, 2002, categorized by topic.
Filed in the same folder
NYC-WTC_000162067
Daily summary of calls received by WTC hotline operators on May 1, 2002, categorized by topic.
Filed in the same folder
Filed in the same folder
NYC-WTC_000162073
Daily summary of calls received by the WTC hotline on May 2, 2002, including requests for indoor air testing.
Filed in the same folder