New York City Department of Environmental Protection
Bureau of Environmental Compliance
Exterior Clean-up Program
As announced in May as part of the downtown cleanup program, DEP took on the responsibility
of cleaning identifiable WTC debris from the exterior of buildings in the downtown area. Out of
the 1073 buildings inspected by DEP, 319 buildings were identified as clean up candidates.
Since June when DEP initiated the exterior clean up program, 159 buildings have been cleaned
to date. These 159 buildings represent over 2 million square feet of World Trade Center debris
as having been removed from exterior of buildings. Ninety-seven buildings have been cleaned
by building owners and confirmed cleaned by DEP inspectors after conducting an inspection of
each building. DEP currently has 33 buildings in the process of being cleaned or in the queue to
start within the next week. Approximately 30 building owners/managers remain on the list to
take advantage of this program before DEP takes action outside the scope of the program. DEP
expects to complete the program by the end of October.
Unoccupied Buildings with Visible Debris
The NYCDEP has undertaken the interior cleaning activities of the remaining unoccupied
buildings. Site-specific cleaning activities were developed. Two contracts were awarded, one
for the cleaning activities and one for the project monitoring and testing.
On September 12, 2002, the cleanup activities of 125 Cedar Street were initiated. These clean
up activities included provisions for pre- and post-clean up environmental sampling. Department
representatives met with tenants and discussed clean up activities. Walkthrough visits were
performed with tenants on multiple days and efforts were coordinated with tenants and the
building management. The cleaning activities are still underway. On Thursday, October 3,
2002, Department representatives completed a preliminary inspection of the building and
identified some areas that required additional clean up efforts. The cleaning of the residential
portion of the building is in its final stage. Re-occupancy will not be approved until the cleaning
meets our satisfaction and the post-cleaning environmental sampling meets the clearance criteria
levels. Final testing has begun with a target date of 10/31 for re-occupancy.
The Department has met with representatives and residents of 114 Liberty Street and discussed
cleanup options. The Department has performed site visits, surveys, and assessments and has
developed the scope of work for the cleanup of the apartments, the HVAC systems, and the
project monitoring and environmental sampling. The developed documents were sent to the
building management and residents and further actions are pending their response.
EPA HOTLINE
The DEP acted as the procurement entity for the US EPA with respect to the establishment of
their HOTLINE, which became operational on June 3, 2002. The HOTLINE, originally
scheduled to end on September 3,2002, has been extended twice and will be available to the