NYC 9/11 Public Portal Document
DEPARTMENT OF DESIGN AND CONSTRUCTION
DIVISION OF INFRASTRUCTURE
REPORT SUMMARY
GRAND TOTAL OF PROJECTS: 84
GRAND TOTAL OF:
BID AMOUNT: $812,257,310.49
CURRENT AMT: $466,222,263.23
VOUCHEREDAMT: $35,278,826,320.77
EST FINAL COST: $829,011,363.55
01/07/2011 Notes; (1) CCD includes 10 days for mobilization for all projects, co The dock for % time elapsed stops at substantial comptefion. (3) Delay is flagged »“% Const CompT is more than 20 points below •% Time Elap Orig"- Page16of 16