DEPARTMENT OF DESIGN AND CONSTRUCTION
OMISION OF INFRASTRUCTURE
CONSTRUCTION STATUS REPORT — ACTIVE PROJECTS
REPORT SUMMARY
GRAND TOTAL OF PROJECTS: 108
GRAND TOTAL OF:
BID AMOUNT: $1,455,132,217.17
CURRENT AMT: $1,479,748,312.40
VOUCHERED $517,768,484.76
EST FINAL COST: $1,618,151 805.27
0210712013 Notes: (1) CCD inctudes 10 days for mobiizaton for ail projects. (2) The clock for % time elepsed stops
€%) Delay is Ragged If"% Cont Compt" is more than 20 pitts below "% Time Elap Orig” Page 2D o¢ 200