NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 31/125 CEDAR STREET
Document / 20 pages

125 CEDAR STREET

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000156813–000156832
Page image
Scanned page image, NYC-WTC_000156819
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Final Report 125 Cedar Street, NYC, NY

The acceptable results of the sampling represent conditions found on the dates the samples were collected. Individual analytes specified earlier were again analyzed in accordance with the project specifications utilizing the following analytical procedures:

• Lead, EPA Method SW-846-601 OB • P AHs, ASTM-6661-01, EPA Method SW-846-8270C • Dioxin, ASTM-6661-01, EPA Method SW-846-8290 • Mercury, EPA Method SW-846-7471A

Scope OF Work

All work performed was conducted in compliance with general industry practices, applicable relevant and appropriate regulations, including, but not limited to the USEPA, USDOL, NYSDOL, NYSDEC, NYCDEP, NYCDOS, and NYCDOH. The scope of work entailed a thorough cleaning of visible dust accumulations fi-om all surfaces within each apartment unit, except as noted within the Project specifications. Cleaning entailed the use of water to mist material prior to cleaning without generating water accumulations. All waste was subsequently double bagged and appropriately labeled prior to disposal. On occasion, equipment that proved to be difficult to clean via wet wiping techniques (i.e.: electrical equipment, fin tube radiators, appliances, etc.) was cleaned by using low pressure compressed air to dislodge settled dust prior to cleaning.

Project Description

Work Sequence

The following lists the sequence for cleaning of accumulated dust:

■ Mobilized equipment and personnel to job site (ATC and Action). ■ Collected and analyzed background wipe samples (ATC). Posted warning signs to establish regulated work areas (Action). Constructed engineering controls per Contract Documents and current regulations (Action). Performed pre-abatement inspection of Contractor engineering controls (ATC). Collected ambient air samples to monitor airborne fiber levels (ATC). ■ Performed required clean-up of settled dust (Action). Performed oversight of Contractor work practices (ATC) ■ Performed proper removal and disposal of geenerated waste from the work areas (Action). ■ Performed visual inspections to ensure no visible debris remaining in work areas (ATC).

ATC Project No. 15.22906.0002 Pages

NYC-WTC_000156819

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000156819Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000156710 · Box DEP Box 31

Notice from the New York City Law Department instructing staff to preserve original World Trade Center documents for potential legal actions.

Filed in the same folder

NYC-WTC_000156797 · Box DEP Box 31

Correspondence requesting a formal letter requiring the sealing of firebrick walls at 125 Cedar Street to allow for reoccupancy.

Filed in the same folder

Compare copies and versions →