NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 31/125 CEDAR 1 OF 2
Document / 2 pages

Timeline of environmental cleaning and monitoring activities, Jun-Sep 2002

Machine-extracted title · confidence 96%

Summary document outlining the timeline of exterior cleaning, inspections, and contract bidding for 125 Cedar Street.

NYC-WTC_000156062–000156063

Folder label: “125 CEDAR 1 OF 2

Page image
Scanned page image, NYC-WTC_000156062
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

125 Cedar Street, Manhattan

June 20-23,2002: Exterior cleaning activities by DEP contractor underway at the roof.

July 16, 2002: Environmental and HVAC consultants were contracted to examine the HVAC systems/exhaust systems and interior surfaces. The Department performed the inspection in conjunction with the consultants. Representatives from the tenants and Mr. Sheldon Silver’s office were also present.

The Department prepared a scope of work for cleaning activities based on the reports prepared by the consultants and sent out the plan for comments to building tenants and the building manager.

The Department prepared a scope of work for environmental monitoring with input from the USEPA. The environmental monitoring procedures outlined sampling to be performed prior to, during, and after clean-up activities.

The Department requested funding from FEMA and prepared projections of cleaning and monitoring costs.

August 2 & 3,2002: DEP walk through inspections performed with tenants and USEPA.

August 28,2002: Mandatory pre-bid meeting was performed at the building with contractors, monitors, tenants, building management, and DEP on site.

September 6,2002: Contract bid opening.

Department Counsel developed cleaning request forms and access authorizations. Some comments from tenants’ counsel were accepted.

September 8 & 9, 2002: Pre-commencement site visits were performed with tenants and contractors who submitted lowest responsive bids (cleaning contractor & environmental monitor).

September 10,2002: DEP coordinated efforts to obtain all cleaning request forms.

September 12,2002: Cleaning and monitoring activities started.

September 12, 2002 - October 3, 2002: Department inspected work progress and provided contractor oversight at a minimum twice per day. USEPA also provided periodic inspections.

In addition to interior work, exterior cleaning activities were performed at a third floor set back, a second floor shaft, and the exterior portion of the 125 Cedar Street facade that was blocked by a sidewalk shed at the start of the project.

October 3, 2002: Visual Inspection performed by DEP, USEPA, third party air monitor, and contractor. Additional areas where cleaning was required were identified.

October 6,2002: Visual re-inspection performed.

NYC-WTC_000156062

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000156062Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000144115 · Box DEP Box 07

Document outlining press release procedures for re-occupancy concerns and detailing protocols for site inspections.

Cited alongside this record in an Ask answer

Compare copies and versions →