NYC 9/11 Public Portal Document
December 17, 2002 114 LIBERTY STREET
REMOVAL OF DUST, DEBRIS, AND CONTAMINATED MATERIALS
50. Worker Decontamination Enclosure System: shall mean that portion of a decontamination
enclosure system designed for controlled passage of workers and other individuals and
authorized visitors, consisting of a clean room, a wash room, and an equipment room separated
from each other and from the work area by airlocks and curtained doorways.
51. Work Site: shall mean premises where abatement activity is taking place and may be composed
of one or more work areas.
1.02 INDUSTRY STANDARDS:
A. Except where these Design Documents include more stringent requirements, applicable
construction industry standards have the same force and effect as if bound or copied directly
into Design Documents. Such standards are made a part of the Design Documents by
reference. Individual sections indicate which codes and standards the Contractor must keep
available at the Project Site for reference.
B. Where compliance with two or more standards is specified, and they establish different or
conflicting requirements for minimum quantities or quality levels, the most stringent requirement
will be enforced. Refer any requirements that are different, but apparently equal, and
uncertainties as to which quality level is more stringent, to Ambient Group, Inc. for a decision
before proceeding.
C. Each entity engaged in work on the Project is required to be familiar with industry standards
applicable to that entity’s work activity. Copies of applicable standards are not bound with the
Design Documents.
1. Where copies of standards are needed for performance of a required work activity, the
Contractor shall obtain copies directlyfrom the publication source.
1.03 SUBMITTALS:
A. For the Owner's records, submit copies of permits, licenses, certifications, inspection reports,
releases, jurisdictional settlements, notices, receipts for fee payments, judgments, and similar
documents, correspondence and records established in conjunction with compliance with
standards and regulations bearing upon performance of the work. This includes landfill and
hauling permits and other documentation of disposal of contaminated waste.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 03
17
© AMBIENT GROUP, INC.-2002
DEFINITIONS AND STANDARDS
NYC-WTC_000155734
OCR can misread numbers and units. Confirm readings against the page image before using them.