December 17, 2002 114 LIBERTY STREET REMOVAL OF DUST, DEBRIS, AND CONTAMINATED MATERIALS

07 TEMPORARY ENCLOSURES & WORK AREA PREPARATION

PART 1 - GENERAL (not applicable)

PART 2 - PRODUCTS

2.01 SHEET PLASTIC

A. Provide flame-resistant polyethylene film that conforms to requirements set forth by the National Fire Protection Association Standard 701, Methods of Fire Tests for Flame Resistant Textiles and Films. Provide largest size possible to minimize seams, 6.0 mils thick, frosted or black, as indicated.

B. Provide translucent, nylon reinforced or woven polyethylene, laminated, flame resistant, polyethylene film that conforms to requirements set forth by the National Fire Protection Association Standard 701, Methods of Fire Tests for Flame Resistant Textiles and Films. Provide largest size possible to minimize seams, 6.0 mils thick, frosted or black, as indicated.

2.02 MISCELLANEOUS MATERIALS:

A. Provide duct tape in 2" or 3" widths as indicated, with an adhesive which is formulated to stick aggressively to sheet polyethylene, without damage to existing finishes, and capable of adhering under both dry and wet conditions, including use of amended water.

B. Provide spray adhesive in aerosol cans that is specifically formulated to stick tenaciously to sheet polyethylene.

PART 3 - EXECUTION

3.01 SEQUENCE OF WORK:

A. Prior to the start of any prep work, the Contractor shall employ skilled tradesmen for the following work:

1. Disable all ventilating systems or other systems bringing air into, or exhausting air out of, the Work Area. Disable system by disconnecting wires and/or removing circuit breakers, by lockable switch or other positive means to ensure against accidental re-starting of equipment.

2. Lockout power to the Work Area by switching off all breakers and removing them from panels or by switching and locking entire panel. Label panel(s) with the following notatiori: "DANGER CIRCUIT BEING WORKED ON".

3. Lock out power to circuits running through Work Area whenever possible by switching off and removing breakers from panel. If circuits must remain live, the Owner shall notify the Contractor in order that he maysecure a variance. Protect any conduit or wires to

31 © AMBIENT GROUP, INC.-2002

TEMPORARY ENCLOSURES AND WORK AREA PREPARATION

NYC-WTC_000155496

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000155496Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →