13 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗Asbestos air sampling methodology 114 Liberty, Feb 2003
Machine-extracted title · confidence 85%Technical correspondence addressing asbestos air sampling methodology and pump flow rate specifications.
NYC-WTC_000155430–000155437Folder label: “114 LIBERTY 2 OF 2”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
VI New York City Department of Environmental Protection Bureau of Environmental Compliance
Monitoring Contractor Scope of Work for 114 Liberty Street, Manhattan
Background
A follow-up visit to 114 Liberty Street revealed minor dust accumulations present on surfaces within the interior of the building. The interior cleaning is to be accomplished by a licensed asbestos abatement contractor and monitored by a Monitoring Contractor.
Purpose
The Monitoring Contractor shall provide personnel experienced, trained, and certified in environmental sampling and asbestos air monitoring to be on-site, full-time, during work area preparation and cleaning phases of building interiors (12 stories -5,000 to 6,000 square feet per floor). Each apartment occupies an entire floor with the exception of the top floor that is a duplex and the apartment on the third floor that shares the floor with two commercial spaces. The entire interior of the building (residential, commercial, retail spaces, common spaces, etc.) is included in this work. Each floor has central HVAC systems.
The Monitoring Contractor shall provide qualified staff to observe the work, conduct air monitoring and sampling, and monitor the cleanup of the building interiors to ensure compliance with the project specifications and appropriate regulatory requirements. The Monitoring Contractor shall provide clearance sampling and analyses.
The Monitoring Contractor shall provide qualified staff to collect samples for asbestos, lead, polyaromatic hydrocarbons (PAHs), dioxin, fibrous glass, and crystalline silica.
An accredited laboratory shall perform all sample analyses.
The Work shall be performed 24 hours per day, seven (7) days per week. Pre-clean up sampling must begin within 24 hours of receipt of the Commence Work letter. All pre-clean up samples must be completed and submitted to the laboratory for analysis within 48 hours.
Air Monitoring/Construction Inspection Services
Air monitoring by a Monitoring Contractor shall be conducted during all cleanup activities. The Monitoring Contractor shall provide individuals certified as project monitors and air sampling technicians to perform daily air sampling and inspections fi-om the commencement of the project through final clearance sampling. The Monitoring Contractor shall provide sufficient equipment and experienced personnel to monitor work area preparation and cleaning phases of the building interiors.
Qualifications
Project Monitoring The Project Monitors must posses valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects. The Project 1 of 6
NYC-WTC_000155432
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
13 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156050
Document tracking the chain of custody for environmental samples collected at 114 Liberty Street on August 22, 2002.
13 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
13 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162815
Request for review of monitoring contractor specifications for air sampling, including sampling methodologies, limits of detection, and clearance criteria, with reference to prior…
13 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162838
Correspondence regarding Schedule A forms and a draft scope of work for cleaning and air monitoring contracts at the site.
12 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139389
DEP forwards inspection report for 125 Cedar Street along with NYC guidelines on fungal remediation.
12 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 114 Liberty Street · 3 pages · confidence 0.15 · verify page 1
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000155258
Notice instructing that original World Trade Center documents must be preserved as evidence and not disposed of.
Filed in the same folder
NYC-WTC_000155259
Notice instructing that original WTC documents must be preserved as evidence and not disposed of.
Filed in the same folder
NYC-WTC_000155264
Letter from EPA official to a Congressional representative criticizing the adequacy of the 114 Liberty Street cleanup.
Filed in the same folder
NYC-WTC_000155286
Formal letter criticizing the EPA and DEP for alleged failures in cleaning asbestos and silica from 114 Liberty Street.
Filed in the same folder
NYC-WTC_000155293
Congressional press release citing evidence of persistent WTC dust contamination at 114 Liberty Street.
Filed in the same folder