Chain of custody record, 114 Liberty cleanup, February 2003

Machine-extracted title · confidence 65%

Chain of custody documentation for cleanup and monitoring samples at 114 Liberty distributed among project team members.

NYC-WTC_000155174–000155186

Folder label: “114 LIBERTY 1 OF 2

Page image
Scanned page image, NYC-WTC_000155179
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

[FOR THE ASBESTOS IN AIR SAMPLES, ASK TO SEE THE RESULTS FOR THE FIBERS THAT ARE <5 MICRONS IN SIZE, AS WELL.] (23) After successful clearance monitoring, isolation barriers shall be removed in accordance with the applicable requirements of Title 15, Chapter 1 of the RCNY. (24) The cleaning contractor is not responsible for damage or loss caused by the acts of parties not involved with the cleanup. Resident shall be responsible for the removal of any valuables. If such removal is not feasible, the resident shall notify the Project Monitor in writing (including original receipt, formal appraisal, or estimated value) as to the location, description and value of said item. (25) Disposal of all wastes generated during the cleaning shall be the responsibility of the contractor. All waste generated shall be treated as asbestos-containing material (ACM) with the exception of items that can be cleaned prior to disposal. As specified above, large items may be cleaned and disposed as non-regulated waste with prior authorization by the Department. Transportation and disposal of generated waste shall be in compliance with all applicable rules and regulations. (26) All work shall be in compliance with all other applicable requirements of Title 15, Chapter 1 of the RCNY. (27) The following table contains special conditions and handling instructions for items in specific units. Items not specifically referenced in this table shall be handled in accordance with the procedures specified in this scope of work and in written documentation provided by residents via DEP.

Action Item / Notables Floor No. A partition/ barrier shall be installed at the damaged north wall. An isolation barrier shall 5*” then be installed._______________________________________________________ A partition/ barrier shall be installed at the damaged north wall and ceiling. An isolation 4* barrier shall then be installed.______________________________________________ Commercial space: The HVAC system, associated ductwork and suspended ceiling shall be 3*^ removed and discarded.__________________________________________________ The HVAC system and associated ductwork, and stove exhaust ducts shall be removed and discarded. ____

[WHAT ABOUT AREAS IN THE BASEMENT THAT WERE AFFECTED?] (28) Time sheets shall be submitted to DEP on a weekly basis. (29) At the completion of work a final report shall be submitted to DEP. The final report shall include ------ eopies-of the daily logs (activities and entry/exit logs), waste manifests, etc. . ................ __

5 of 5 2/7/03

NYC-WTC_000155179

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000155179Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →