NYC Law Department release Independent mirror · updated as the City releases more · v1.3.3 ☕ Buy me a coffee
← Document results/DEP Box 26/WORLD TRADE CENTER - RESIDENTIAL APARTMENTS
Document / 9 pages
Draft scope of work for WTC residential dust cleaning, August
Machine-extracted title · confidence 90%
Draft document outlining procedures for asbestos removal and HEPA vacuuming in residential buildings south of Canal Street following the World Trade Center collapse.
NYC-WTC_000154327–000154335
Folder label: “WORLD TRADE CENTER - RESIDENTIAL APARTMENTS”
vacuumed two times. Fabric covered furniture that is not cleaned by wet methods will
be vacuumed using a stiff brush attachment.
8. Intake/discharge registers of HVAC systems (if present) will be removed/cleaned. The
first foot of duct work will also be vacuumed; then the register will be reins^kd and
covered with plastic. x
9. Window and room air conditioners will be vacuumed and r from
to allow access to internal portions of the air conditioner. ^■Bernal porti^fl
air conditioner and housing will then be vacuumed. F^ p will be vaa^BS
reinstalled. Air conditioners will be reassembled and r« italled afte^^aning.
10. Paperwork and books will be HEPA vacuumed. fl
11. Electrical outlets will be vacuumed. fl
12. Appliances such as refrigerators and stoves will be clfl ived. The floor
footprint of the appliances will be cleaned and the appliand stalled in their
original positions.
13. Refiigerator cooling tubes will be brushed and vacuuf^W.
14. Stove storage drawers, will be vacuumed if present. Stopcock tops id
vacuumed. Stove exhaust fan filters will be
15. The first foot of all exhaust duct work (includ^H^^^^^ id bathrooi ;s) will
be vacuumed. Exhaust fans will be vacuflR^idfl^fl
16. Closet floors will be vacuumed.
17. Solid objects (electrical equipmen^Kercise eoflment^ ■ce wet wiped,
moved to allow cleaning of the uijfltying surfj^and will b led to their original
location. J
18. Dishwasher toe plates will LOved [e floor bo^^th the appliance will be
cleaned. J
19. fuseboard heaters wjU bB leaned. Pn finned radiant heaters and
^B|board heatersj^^^^B loved to e ents. Fins are to be brushed and
^^■med to
20? cquq^^^H vacuumed and/or wet wiped after completion of the
before work area.
9. HEPA air fi^^H (AFDi ^■^continuously during all cleaning activities, as
appropiufl^^H . One^Wuard 1200 cubic feet per minute (CFM) device shall
be h^m^ per 36,i
10. linimum of one asb’ ^isor shall be present in each building during work.
11 A Cleaning Checklist ^e developed by EPA) will be completed by the cleaning contractor
as tasks are comple^ IO document the progress of the cleaning.
cleanin' :tor shall notify the monitoring contractor immediately upon completion
5
NYC-WTC_000154331
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000154331Source: NYC Law Department, mirrored locally
Draft document outlining procedures for asbestos removal and HEPA vacuuming in residential buildings south of Canal Street following the World Trade Center collapse.
9 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.997
Letter advising EPA that DEP's Bureau of Environmental Compliance reviewed the draft cleaning contract scope for World Trade Center indoor dust cleaning.
Draft document outlining procedures for asbestos removal and HEPA vacuuming in residential buildings south of Canal Street following the World Trade Center collapse.