NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 26/WORLD TRADE CENTER 125 CEDAR
Document / 6 pages

Cleaning request form for 125 [name], Manhattan, World Trade Center

Machine-extracted title · confidence 95%

Resident requests DEP cleaning and monitoring at 125 [name] following WTC collapse debris accumulation.

NYC-WTC_000153551–000153556

Folder label: “WORLD TRADE CENTER 125 CEDAR

Page image
Scanned page image, NYC-WTC_000153551
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Cleaning Procedures For 125 Cedar Street

New York City Department of Environmental Protection Bureau of Environmental Compliance

Asbestos Contractor - Cleaning Procedures

Background

A follow-up visit to 125 Cedar Street, a.k.a. 110 Liberty Street, revealed debris and significant dust accumulation present on surfaces throughout the interior of the building. The interior cleaning is to be accomplished by a licensed asbestos abatement contractor.

Purpose

A New York State Department of Labor (NYSDOL) licensed asbestos contractor with NYC DEP and NYSDOL certified workers shall perform the clean up of building interiors (12 stories, a penthouse, and a basement-5,000 to 6,000 square feet per floor). The entire building including common spaces, storage spaces, residential and commercial spaces (includes retail space on Liberty Street) shall be included in the clean up activities.

Scope of Work

(1) All work performed shall be in compliance with all applicable, relevant, and appropriate regulations, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor, the New York State Department of Labor (NYSDOL), the New York State Department of Environmental Conservation, the New York City Department of Sanitation, the New York City Department of Health (NYC DOH), and the New York City Department of Environmental Protection (NYC DEP).

(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos Control Program prior to the start of work. USEPA and NYSDOL notification shall be submitted.

(3) A third party air monitoring firm shall perform air sampling and provide project oversight.

(4) The asbestos contractor shall provide sufficient equipment and experienced persoimel to complete work area preparation and cleaning activities of the building interiors within three (3) weeks. At least one asbestos supervisor shall be present per work area during the duration of the clean-up activities. Work shall be performed 24 hours per day, seven (7) days per week.

(5) Personal protective equipment including disposable clothing, gloves, and respirators shall be worn during this clean-up activity.

(6) Warning signs shall be posted at the approach to each work area.

1 of 6

NYC-WTC_000153551

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000153551Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →