NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 26/No folder label
Document / 21 pages

NYC-WTC_000153058

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000153058–000153078
Page image
Scanned page image, NYC-WTC_000153067
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DRAFT EXCERPTS - FOR REVIEW & DISCUSSION PURPOSES ONLY

Treatment of Asbestos-Containing Materials

Both NYCDDC and EPA officials told us that when asbestos-containing material (e.g., pipe wrapping, steel insulation) was encountered during the removal, it was tested and treated in accordance with asbestos abatement procedures. According to the NYCDDC official, the majority of the asbestos-containing material was encountered when removing the remnants of the basement levels of WTC 6.

EPA Situation Reports confirmed the NYCDDC official’s statement about asbestos abatements at the site. The reports recorded instances where asbestos was found during debris removal and asbestos abatements performed. For example, the EPA May 23, 2002, situation report noted that:

Twelve (J2) bulk asbestos samples were taken in the Bl, B2, B3, levels of (WTC) Building 6. The samples were taken from sprayed on insulation at the request of NYC DOI. Of the twelve samples, nine (9) should (sic) results were in excess of 1% Chrysotile asbestos, the results rangedfrom 1.30% to 30.80%. The three samples that were not above 1% were detectfor Chrysotile asbestos.

The situation reports also noted the presence of asbestos-containing material and the operation of another abatement project at the WTC site in April 2002. According to the April 5, 2002, Situation Report, bulk testing showed that one sample of the pipe wrap that was being removed as part of this abatement contained 66 percent amosite’ asbestos.

Removal of Debris From Site

In order to minimize dust emissions. City, State, and Federal officials established procedures for trucks hauling debris from the site. These procedures included the use of tarps (nylon mesh) to cover debris and procedures for wetting down the trucks before they left the site. The truck wetting operation was performed by contractors for EPA. The large volume of traffic made ensuring compliance with procedures difficult. Particularly in the weeks immediately following the disaster, trucks hauling debris from the site did not consistently stop to be wetted down

1 Amosite is a form of amphibole asbestos. Several studies suggest that amphibole asbestos may be more harmful than chrysotile asbestos, particularly for mesothelioma. Test results from the site showed that the asbestos was predominantly chrysotile, not amphibole.

9

NYC-WTC_000153067

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000153067Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →