NYC 9/11 Public Portal Document
Both NYCDDC and OSHA officials told us that the WTC site was under
continuous dust suppression, and the latter said this dust suppression was very
successful. An EPA On-Scene Coordinator told us that once dust suppression
began, water was sprayed wherever there was dust and, to the best of his
knowledge, this practice was successful. OSHA officials further stated that it
would have been too dangerous to send abatement contractors into WTC 4,
WTC 5, or WTC 6 to remove asbestos-containing material before demolition.
Both NYCDDC and EPA officials told us that when asbestos-containing material
(e.g., pipe wrapping, steel insulation) was encountered during the removal, it was
tested and treated in accordance with asbestos abatement procedures. According
to the NYCDDC official, the majority of the asbestos-containing material was
encountered when removing the remnants of the basement levels of WTC 6.
EPA Situation Reports confirmed statements about asbestos abatements and
recorded instances where asbestos was found during debris removal and asbestos
abatements performed. For example, the EPA May 23,2002, Situation Report
noted that:
Twelve (12) bulk asbestos samples were taken in the Bl, B2, B3, levels
of (WTC) Building 6. The samples were taken from sprayed on
insulation at the request ofNYC DOI. Of the twelve samples, nine (9)
should (sic) results were in excess of 1% Chrysotile asbestos, the
results rangedfrom 1.30% to 30.80%. The three samples that were
not above 1% were detectfor Chrysotile asbestos.
According to the April 5, 2002, Situation Report, bulk testing showed that one
sample of the pipe wrap that was being removed as part of this abatement
contained 66 percent amosite" asbestos.
l/I/drk Practices Related to Transporting Waste Not Always Followed
To minimize dust emissions. City, State, and Federal officials established
procedures for trucks hauling debris from the site. These procedures included the
use of tarps (nylon mesh) to cover debris and procedures for wetting down the
trucks before they left the site. The truck wetting operation was performed by
contractors for EPA. The large volume of traffic made ensuring compliance with
procedures difficult. Particularly in the weeks immediately following the disaster,
trucks hauling debris from the site did not consistently stop to be wetted down
before leaving the site. As a result. New York City obtained assistance from the
New York State Department of Environmental Conservation Police and the
National Guard to ensure that trucks stopped at the wash stations before leaving
11
Amosite is a form of amphibole asbestos. Several studies suggest that amphibole asbestos may be
more harmful than chrysotile asbestos, particularly for mesothelioma. Test results from the site
showed that the asbestos was predominantly chrysotile, not amphibole.
36 Report No. 2003-P-00012
NYC-WTC_000145391