Meeting notes from October 17, 2002, detailing issues with contractor compensation, scheduling difficulties, and tenant cancellations for apartment cleanups.
NYC 9/11 Public Portal Document
Lead -clen
Acbesten ? EPa
• Dionia EPa -Spelug
Pah's = Epa sap reed moe sonsutivee
= Epa
EPA/ DEP meeting with Indoor Contractors
Patt moore= sot
KyfoA
125 wdest
)
October 17, 2002
C
ge voe
Common Issues
Poor response to telephone calls.
One consultant mailed letters and access agreement to all the tenants/ occupants
requested apt cleanings. Another consultant emailed the same information.
V Cancellation of the clean up by the tenants/ occupants on the scheduled cleaning day. 1x
Consultants and contractors want some kind of compensation (4hrs / half a shift).
coneldtes
Shenide wnt
Security Clearance
The requirements are not clear. It can cost as much as $350 per person - Epa
= sssul
HVAC
Consultant Issues
Data entry and other administrative work takes a long time. One person is dedicated
to make all the (multiple) phone calls.
Requested compensation
chimp orde
Impossible to schedule more than 6-10 apartments / day -Efa
Project completion form is not ready (EPA)
Peeling paint
HVAC contractor is charging a lot of money
Can the analytical lab supply cassettes? - Epa tur lool ante
HVAC / Bubbles
5 unuts/
06
Contractor Issues
par
Change ade?-S com un pat in
whil contruery =
wol
Waste manifest
swet
Still not asvolund
One consultant is not letting the contractor work more than 6-7hrs a day& more than
15 apts. / day (Cole & JBH). Two year contract...
Ele to speat to it voxneed to call in,
conseltas
Work flow is not steady. Contractors need consistent amount of work. Unless this >EPo
problem is corrected we may have serious problems.
Need to coor
better.
Apartment sizes are too big. Some of the terraces / balconies are huge- DEP
NYC-WTC_000151239
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000151239Source: NYC Law Department, mirrored locally
Contract excerpt defining regulatory compliance requirements and describing visual assessments of debris on building exteriors near the World Trade Center.
3 shared non-person entities · Same agency, volume and box · similarity 0.924
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.