Notes on WTC Apartment Cleanup Meeting

Machine-extracted title · confidence 95%

Meeting notes from October 17, 2002, detailing issues with contractor compensation, scheduling difficulties, and tenant cancellations for apartment cleanups.

NYC-WTC_000151239–000151240

Folder label: “CONTRACTS CONTRACTORS - See: $ matrics etc file

Page image
Scanned page image, NYC-WTC_000151239
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Lead -clen Acbesten ? EPa • Dionia EPa -Spelug Pah's = Epa sap reed moe sonsutivee = Epa EPA/ DEP meeting with Indoor Contractors Patt moore= sot KyfoA 125 wdest ) October 17, 2002 C ge voe Common Issues Poor response to telephone calls. One consultant mailed letters and access agreement to all the tenants/ occupants requested apt cleanings. Another consultant emailed the same information. V Cancellation of the clean up by the tenants/ occupants on the scheduled cleaning day. 1x Consultants and contractors want some kind of compensation (4hrs / half a shift). coneldtes Shenide wnt Security Clearance The requirements are not clear. It can cost as much as $350 per person - Epa = sssul HVAC Consultant Issues Data entry and other administrative work takes a long time. One person is dedicated to make all the (multiple) phone calls. Requested compensation chimp orde Impossible to schedule more than 6-10 apartments / day -Efa Project completion form is not ready (EPA) Peeling paint HVAC contractor is charging a lot of money Can the analytical lab supply cassettes? - Epa tur lool ante HVAC / Bubbles 5 unuts/ 06 Contractor Issues par Change ade?-S com un pat in whil contruery = wol Waste manifest swet Still not asvolund One consultant is not letting the contractor work more than 6-7hrs a day& more than 15 apts. / day (Cole & JBH). Two year contract... Ele to speat to it voxneed to call in, conseltas Work flow is not steady. Contractors need consistent amount of work. Unless this >EPo problem is corrected we may have serious problems. Need to coor better. Apartment sizes are too big. Some of the terraces / balconies are huge- DEP NYC-WTC_000151239

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000151239Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000151127 · Box DEP Box 11

A notice instructing that original World Trade Center documents must be preserved as evidence and not disposed of due to potential legal actions.

Filed in the same folder

NYC-WTC_000151141 · Box DEP Box 11

Letter confirming contractor responsibility for cleaning residences and HVAC systems in accordance with project scope.