Summary of the total sample collected and the status of the collected samples.
Asbestos Dioxin Fibrous Glass Lead MMVF PAHs Silica
Counts Wipe Air Microvac Wipe -Air Wipe Air Wipe Air Microvac Wipe Air Wipe Air Wipr Air
Collected, no results . 11 39 9 3 , 0 7 0 43 39 18 0 28 7 0 24 20
Analyzed 147 0 115 0 0 131 0 0 0 0 0 0 0 0 101 0
Cleared 0 0 0 0 0 0 0
Exceeded
Not Evaluated Em 0
0
■ V
0
■ 0
0
0
0
0
0 2
J, 1
0 I 0
0
0 ro
jj: j
0 1
2
0
0
“1
I V. -M
I 0
Key:
Collected, no results Sample collected, no analytical results received yet.
Analyzed Results received but no clearance value available, thus they are classified only as being analyzed.
Cleared Below our clearance values.
Exceeded Exceeded our clearance values (note: silica detection limit above clearance value).
Not Evaluated No anaiyticalanalysiswas conducted.
Request for review of monitoring contractor specifications for air sampling, including sampling methodologies, limits of detection, and clearance criteria, with reference to prior…