NYC 9/11 Public Portal Document
THIRD
FLOOR
LEGEND:
AREA NAMEL
ICLBANING+METHOD S)LL
NOTATION NT
AREA DESCRIPTION BOX
20
30
APPROXIMATE SCALE: 1"=20'
40
N
W-
E
APARTMENT
UNIT 3C
13B
LIBERTY STREET
STAIR
STAIRCASE
LUBERTY:
4A 48
APARTMENT
LUNITA3D.
1A-rl:
HALLWAY
S
ROOF
ROOF
APARTMENT
UNIT 38
SCOPE A
ELEVATOR
SHAFT"
4A
STAIR
STAIRCASE
ICEDAR
4A 48
APARTMENT
.UNIT 3A
DAVID BALDWN
REALTY CO.
28
CEDAR STREET
DRAWING STATUS DRAFT • FINALX
PROJECT NO. :50506060 RESPONSE MANAGER: SCOTT WLHELM PROGRAM MANAGER: BRADLEY 1. CUNNINGHAM PROGRAM/CONTRACTS MANAGER: KIM D. BENNETT
SCALE: 1° = 20°
REVISION NO.: 0
TREV DATE: NA
CADD ID: 501060_3
PLOT DATE: 2/10/03 CHK BY: K.D.B.
CHK DATE:
2/10/03
DRN BY: AML
DRN DATE:
12/9/02APPVD BY: K.D.B.
TAPPVD DATE: 2/10/03
WTC RESIDENTIAL
WRS Infrastructure &
Environment, Inc.
25 267 5+0003 X (207 59-004
RISTOL, PENNSYLVANIA 1900
CONFIRMATION CLEANING STUDY
110 LIBERTY STREET, NEW YORK, NEW YORK
US DEPARTMENT OF ENVIRONMENTAL PROTECTION
CONTRACT NO. 68-S2-99-07
DELIVERY ORDER NO. 060
NYC-WTC_000145073
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000145073Source: NYC Law Department, mirrored locally
Document excerpt acknowledging contributors and outlining the collaborative scope of an EPA environmental protection study regarding the World Trade Center site.
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.