NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
NYC-WTC_000145027–000145344Folder label: “NO INFO”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
2. PROPOSED PLANS AND PROJECT OBJECTIVES
EPA will evaluate eight cleaning techniques during the study. Fifteen (15) separate units will be identified and evaluated based on the following criteria: exposure to ground zero, type of interior decorating and the location of the unit in the building. Cleaning techniques will be specific to each unit and will consist of basic vacuuming with standard household equipment to use of advanced commercial quality equipment. Wet wiping of horizontal surfaces will be performed in each unit. The use of wet vacuiuns for cleaning carpets will also be investigated. Comprehensive sampling for COPC will be conducted prior to, during and after the cleanup. Laboratory data will be evaluated by EPA to determine the efficiency and effectiveness of each cleanup technique as well as possible exposures to individuals performing the task.
The Cleanup Plan details the tasks and procedures to be used during the cleaning of specific units. Tasks will be identified and protocols will be detailed for building assessments, setup of support/decontamination zones, vacuuming/washing and disposal.
The Sampling and Analysis Plan (SAP) presents the detailed procedures and methods for sampling and analysis of bulk, surface and airborne dusts. Sampling will be performed during all phases of the cleanup. A Quality Assurance Project Plan (QAPP) is included in the Sampling and Analysis Plan to ensure that the sampling and analysis are conducted in conformance with EPA Quality Assurance/Quality Control (QA/QC) objectives.
The Health and Safety Plan (HASP) provides the minimum safety requirements that will be implemented during the activities conducted under the Cleanup and Sampling Plans. The Health and Safety Plan satisfies the requirements of 29 CFR 1910.120.
3. CLEANUPPLAN
This Cleanup Plan describes the procedures and protocols to be implemented for the following tasks:
i) support areas, security ii) building and apartment access and assessment; iii) photo documentation, and inventories of existing conditions; iv) cleaning of common areas, building exteriors, elevator shafts and heating systems; v) decontamination areas; vi) procedures for interior cleaning; vii) procedures for containment and disposal of cleanup wastes.
The sampling program to be implemented is summarized in Section 4. Specific details of sampling activities/protocols/methods performed during the Cleanup are presented in the Sampling and Analysis Plan and associated QAPP. All activities performed under the Cleanup Plan will be performed in accordance with the health and safety protocols presented in the Health and Safety Plan.
2
NYC-WTC_000145047
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
20 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117441
Report from Athenica Environmental Services regarding HVAC and environmental inspections at 375 South End Avenue.
13 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117561
Cover letter from Athenica Environmental Services regarding HVAC and environmental inspections at 395 South End Avenue.
11 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗16 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
20 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
12 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164732
Draft spreadsheet of asbestos sampling results from residential locations collected November-December 2001, circulated for review.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139712
Series of emails forwarding a draft memo between DEP staff members for review and finalization.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
12 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164784
Transmission of revised asbestos sampling results for residential samples collected November-December 2001.
15 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
25 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000150209
Laboratory report listing PCM and TEM asbestos air sampling results collected on September 26, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0123.
Cited alongside this record in an Ask answer