PROJECT .....................................................
DESCRIPTION: Metropolitan Transportation Authority
’Wysfessssaa
iiis Current (Jontii(ions:
The current station is configured as a loop, and the
plattorni only accommodates 5 of the 10-car subway trains. As a result, the
passengers in the rear five cars must walk to the first five cars in order to
exit the train. The loop configuration also hinders efficiency throughout the
entire 1/9 line. Currently, there is a connection to the Staten Island ferry,
but no direct passenger connections to other subway lines.
Estimated SeieduE and (Jost
3 to 4 years
J400 million
Issues and Itn^act:
► Value to Lower Manhattan:
• The service improvement will increase capacity throughout all of the 1/9
line, reducing travel time for commuters traveling to Lower Manhattan
from Penn Station.
Overall Impact:
• Accommodates loading of full-length 10-car trains.
’ Additional entrance created.
• Improves reliability, on-time performance, and travel time for
Manhattan’s West Side subway service.
• Provides a new free connection between the 1/9 line at South Ferry and
the N/R line at Whitehall St.
• Given that Staten Island is the fastest growing of the five boroughs —
and that its population growth rate will be among the top half of coun
ties in the region over the next 25 years — improvements to South Ferry
station will help to accommodate increased Staten Island ferry ridership.
• Provides ADA (American Disabilities Act) accessibility
Current Status
Currently in planning stage
Chapter 1: Rc-stdring and Renewing Lower Manhattan’s Transportation lid rastructure 29